Showing 1–5 of 728
  1. Pre Project Stage Cement Updated

    Rs.5810 Million Standalone Clinker Grinding Unit in Bareilly, Uttar Pradesh

    Uttar Pradesh From 5000 Million to 49999 Million

    A standalone clinker grinding unit with cement production capacity of 3.0 million TPA is proposed, along with a railway siding with wagon tippler and a 1250 KVA D.G. set. The project is currently under examination for Terms of Reference with the Ministry of Environment, Forest and Climate Change.

    View project
  2. Pre Project Stage Cement Updated

    Rs.1750 Million Fibre Cement Board Manufacturing Unit in Tonk district, Rajasthan

    Rajasthan From 1000 Million to 4999 Million

    A new industrial shed for fibre cement board manufacturing is proposed at Rachakpura village, Niwai tehsil, Tonk district in Rajasthan, spread over about 10.95 hectares of non-forest land. The proposal, valued at Rs. 1750 Million, is currently under environmental appraisal with the Ministry of Environment, Forest and Climate Change, with an Expert Data System (EDS) query raised. The project is expected to generate around 50 permanent jobs during operations.

    View project
  3. Pre Project Stage Cement Updated

    Rs.29125 Million Greenfield Cement Clinkerisation Plant in Baloda Bazar-Bhatapara, Chhattisgarh

    Chhattisgarh From 5000 Million to 49999 Million

    A greenfield integrated cement complex is proposed comprising a 4.5 MTPA clinkerisation unit, a 1.0 MTPA grinding unit, and captive CFBC/AFBC (40 MW) and WHRB (12 MW) power plants. The project is currently at the Terms of Reference stage before the Ministry of Environment, Forest and Climate Change, with land acquisition partially completed. Construction is yet to commence.

    View project
  4. Pre Project Stage Cement Updated

    Rs.30000 Million New Cement Mfg. Unit in Palnadu, Andhra Pradesh

    Andhra Pradesh From 5000 Million to 49999 Million

    A major industrial firm has secured state investment promotion board approval to establish a greenfield cement manufacturing facility in Palnadu district, Andhra Pradesh. The Rs. 30,000 million project involves setting up a modern plant backed by state government incentives and land allotments, designed to boost regional manufacturing and local employment opportunities.

    View project
  5. Pre Project Stage Cement Updated

    Rs.298 Million PPC/OPC Cement Grinding Unit in Muzaffarpur, Bihar

    Bihar From 100 Million to 999 Million

    A standalone 50 TPH PPC/OPC cement grinding and packing unit is proposed at Kanti in Muzaffarpur district, Bihar, using closed-circuit two-compartment ball mill technology with a high-efficiency separator. The unit will process clinker, fly ash and gypsum across a 2.35 ha site, with no captive limestone mining or clinkerisation involved. The proposal is currently under examination by the Ministry of Environment, Forest and Climate Change for grant of Terms of Reference.

    View project