Rs.28860 Million Transmission System Strengthening Project in Andhra Pradesh
A major transmission system strengthening project is set to begin in Kurnool and Palnadu, Andhra Pradesh, aimed at integrating additional renewable energy generation. With a projected cost of ₹28,860 million, construction commenced in March 2025 and is scheduled for completion by December 2027. As of May 2025, the project is in the “Notice to Proceed” stage under the EPC model.
View project