Thermal Power & Grid Infrastructure Projects in Telangana

32 upcoming and ongoing thermal power & grid infrastructure projects in Telangana worth ₹104,209 Cr, with investment, location, project stage and latest status. Last updated 15 Jun 2026.

Projects tracked
32
Total investment
₹104,209 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
0

Latest thermal power & grid infrastructure projects in Telangana

Showing 1–5 of 32
  1. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.293448 Million New Super Thermal Power Project in Peddapalli, Telangana

    Telangana More than 49999 Million

    A major power utility company is establishing a Rs. 293,448.5 million expansion project [3 x 800 MW] in Peddapalli, Telangana. Developed via the EPC route utilizing high-efficiency ultra-supercritical technology, the 2,400 MW generation asset is scheduled for construction from March 2026 to January 2032. The project has advanced to the "Notice to Proceed" phase.

    View project
  2. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    Rs.67899 Million Singareni Thermal Power Plant Expansion Project in Telangana

    Telangana More than 49999 Million

    A company is expanding its thermal power plant in Mancherial, Telangana, increasing capacity from 2×600 MW to 2,000 MW with the addition of an 800 MW supercritical coal-based unit. The project spans 127.31 hectares with a revised investment of ₹67,899.6 million. As of October 2025, Power Mech is handling the complete Balance of Plant package, including engineering, procurement, construction, civil works, systems, trial runs, and maintenance, under a ₹25,000 million contract.

    View project
  3. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.163262 Million Telangana Super Thermal Power Project, Phase-II in Telangana

    Telangana More than 49999 Million

    A major thermal power project is underway in Telangana, featuring three 800 MW units to enhance regional power capacity. Initially estimated at ₹293,448 million, the revised cost is ₹163,262 million. Construction is set to begin in September 2025 and finish by August 2030. As of July 2025, the project is awaiting environmental clearance from the state authority.

    View project
  4. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.108777 Million New Thermal Power Project in Suryapet, Telangana

    Telangana More than 49999 Million

    A new thermal power project is planned in Vellaturu, Suryapet, Telangana, involving a 2x150 MW power plant with an estimated investment of ₹108,777 million. Construction is set to begin in March 2026 and finish by February 2028. As of April 2025, the project is under review for environmental clearance by the relevant authorities.

    View project
  5. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    New PNG/FO Fired Boiler Installation Project in Sangareddy, Telangana

    Telangana Less than 100 Million

    A beverage manufacturing company is installing a new PNG/FO-fired 6 TPH boiler at its facility in Telangana, replacing the existing briquette-fired boiler. The upgrade aims to enhance production efficiency for juices, soft drinks, and syrups, totaling 169,654 cases/day. With an investment of Rs. 35 million, the project has received environmental clearance as of March 2025.

    View project