New & Upcoming Projects in Infrastructure Projects in India – Page 15

4,286 upcoming and ongoing infrastructure projects in India worth ?63.45 lakh crore, with investment, location, project stage and latest status. Last updated 16 Oct 2026.

Projects tracked
4,286
Total investment
₹63.45 lakh crore
Projects above ₹100 Cr
2,642
Added in the last 30 days
38

Latest infrastructure projects in India

Showing 71–75 of 4,286
  1. Pre Project Stage Ports / Shipping Updated

    Rs.864 Million Captive Jetty for Handling of Salt & Other Commodities Project in Morbi, Gujarat

    Gujarat From 100 Million to 999 Million

    A ₹86.49 crore captive jetty is proposed near Village Bagasara, Taluka Maliya, District Morbi, Gujarat, inside Chach creek, Gulf of Kutch, about 20 km north-east of Navlakhi Port, for handling salt cargo and other allied commodities. The project involves 17.3 hectares of non-forest government land and is designed for a cargo handling capacity of about 30 lakh tonnes per annum, supporting the company's plan to scale salt production to 1.2 million tonnes by 2030 and export capacity to 3 million tonnes by 2040.

    View project
  2. Pre Project Stage Highways / Roads Updated

    Rs.8100 Million New Elevated Corridor Construction Project in Karnataka

    Karnataka From 5000 Million to 49999 Million

    A new elevated corridor is proposed from Sirsi Circle to Nayandahalli on Mysuru Road in Bengaluru City, spanning about 8.67 hectares of non-forest land with minimal land acquisition along the existing road alignment. The project is a greenfield initiative intended to decongest a heavily trafficked corridor and improve city connectivity. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change, with construction yet to commence.

    View project
  3. Pre Project Stage Highways / Roads Updated

    Rs.12822 Million Construction of Six Lane Green Field Highway in Maharashtra

    Maharashtra From 5000 Million to 49999 Million

    A 34.715 km six-lane greenfield state highway/expressway is proposed between Shendra DMIC and Bidkin, passing through 22 villages across Aurangabad and Paithan talukas of Chhatrapati Sambhajinagar district. The project requires about 221.25 hectares of land (including ~4.42 ha of forest land) and is expected to generate over 11 lakh man-days of temporary employment during construction. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change for grant of Terms of Reference.

    View project
  4. Pre Project Stage Highways / Roads Updated

    Rs.7250 Million Construction of Elevated Corridors in Karnataka

    Karnataka From 5000 Million to 49999 Million

    A 6.8 km network of elevated corridors and a loop flyover is proposed to link Minerva Circle, Hudson Circle, Town Hall, Sangolli Rayanna Circle (Anand Rao Flyover) and Nrupathunga Road (KR Circle) in Bengaluru City. The project is designed to ease congestion on the existing road network and integrate with the BGS Flyover and proposed elevated rotary at Hudson Circle. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change, with land acquisition in process and no physical construction started yet.

    View project
  5. Pre Project Stage Ports / Shipping Updated

    Rs.114765 Million Deep Draft Green Field Captive Port Development Project in Surat, Gujarat

    Gujarat More than 49999 Million

    A greenfield deep draft captive port and jetty with allied infrastructure is being developed at Suvali (Shivrampur) village near Hazira in Surat district, Gujarat, designed to handle around 60 million tonnes per annum of cargo including break bulk raw materials and finished steel products. The project is currently under Environmental Clearance review with the Ministry of Environment, Forest and Climate Change after having secured Terms of Reference, with land acquisition for the ~331 hectare site still in progress. Construction is yet to commence, with the project expected to generate significant construction-phase and operational employment once cleared.

    View project