New & Upcoming Projects in Infrastructure Projects in India – Page 17

4,286 upcoming and ongoing infrastructure projects in India worth ?63.45 lakh crore, with investment, location, project stage and latest status. Last updated 16 Oct 2026.

Projects tracked
4,286
Total investment
₹63.45 lakh crore
Projects above ₹100 Cr
2,642
Added in the last 30 days
38

Latest infrastructure projects in India

Showing 81–85 of 4,286
  1. Announcement Stage Highways / Roads Updated

    Rs.89702 Million Guwahati-Tezpur Corridor in Assam

    Assam More than 49999 Million

    A 135.871 km, 4-lane access-controlled highway corridor connecting Baihata Chariali near Guwahati to Tezpur along NH-15 has been approved. The project includes an Emergency Landing Facility, five major bypasses, 15 major bridges, 30 minor bridges, 19 flyovers, an elephant underpass, and 210 km of service roads. It will be developed on Built-Operate-Transfer (BOT) Toll Mode at a total capital cost of ₹8970.20 crore.

    View project
  2. Announcement Stage Highways / Roads Updated

    Rs.17575 Million New Bhopal-Vidisha Four-Lane Project in Madhya Pradesh

    Madhya Pradesh From 5000 Million to 49999 Million

    The Madhya Pradesh Cabinet has approved a ₹1,757.55 crore project to widen the 44.83 km Bhopal-Vidisha road from two lanes to four lanes with paved shoulders. The project aims to strengthen connectivity within the proposed Bhopal metropolitan region and nearby cities. It will be executed under the Hybrid Annuity Model with a proposed completion timeline of five years.

    View project
  3. Bidding Stage Highways / Roads Updated

    Rs.85860 Million Link Expressway Project in Uttar Pradesh

    Uttar Pradesh From 5000 Million to 49999 Million

    A 74 km, six-lane access-controlled expressway is being developed to directly connect the Yamuna Expressway with the Ganga Expressway, passing through Gautam Buddha Nagar and Bulandshahr districts. Tenders have been floated for the first two phases covering design, engineering, procurement, construction and maintenance, with a three-year completion schedule and a five-year defect liability period. The corridor will include seven underpasses, 11 minor bridges, three major bridges, a flyover and four railway overbridges, and is designed for future widening to eight lanes.

    View project
  4. Announcement Stage Logistics Park / Industrial Park Updated

    Rs.4650 Million New Integrated Industrial Park in Bengaluru Rural, Karnataka

    Karnataka From 1000 Million to 4999 Million

    A new ₹4,650 million integrated industrial park is planned for Doddaballapura taluk, Bengaluru Rural, Karnataka. The project encompasses extensive warehousing, logistics facilities, and dedicated commercial and residential zones. Planning has progressed significantly after securing key official clearance from the State Level Single Window Clearance Committee.

    View project