Environment Projects in India – Page 12

672 upcoming and ongoing environment projects in India worth ₹1,054,950 Cr, with investment, location, project stage and latest status. Last updated 30 Sep 2026.

Projects tracked
672
Total investment
₹1,054,950 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
24

Latest environment projects in India

Showing 56–60 of 672
  1. Environment Clearance Stage Environment Updated

    Rs.1070 Million Chocolate Manufacturing Plant Expansion Project in Sangareddy, Telangana

    Telangana From 1000 Million to 4999 Million

    A chocolate manufacturing company is expanding its existing plant in Nasthipur village, Sangareddy district, with an additional investment of about ₹107 crore. The expansion adds a new Choco Pie production line of 720 TPM while retaining existing chocolate, cocoa powder, cocoa butter and cocoa mas capacities. The State Pollution Control Board has issued Consent to Establish for the expansion, valid for five years.

    View project
  2. Pre Project Stage Environment Updated

    Rs.739 Million New Integrated Municipal Solid Waste Processing Facility in Madhya Pradesh

    Madhya Pradesh From 100 Million to 999 Million

    A new integrated municipal solid waste management facility is proposed for Ratlam and neighboring urban local bodies (Jaora, Namli, Piploda, Dhamnod, Sailana), comprising a 120 TPD MRF-cum-RDF plant, a Compressed Bio-Gas plant processing 150 TPD of biodegradable waste, and a sanitary landfill designed for 82,024 m³ capacity. The project is at fresh Terms of Reference stage with the Ministry of Environment, Forest and Climate Change, with a total cost of about ₹73.97 crore and land requirement of 9.39 hectares. An environmental data scrutiny (EDS) query has been raised, with baseline data collection already completed.

    View project
  3. Pre Project Stage Environment Updated

    Rs.1888 Million New Hospital, Medical College Construction Project in Tamil Nadu

    Tamil Nadu From 1000 Million to 4999 Million

    A fresh environmental clearance proposal has been filed for construction of a hospital-cum-medical college campus along with hostel buildings and staff quarters, spread over a built-up area of about 95,795 sqm on 5.31 hectares of privately acquired land. The project is expected to generate around 40 permanent and 500 temporary jobs during construction and roughly 400 permanent staff once operational. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change under Category B2.

    View project
  4. Environment Clearance Stage Environment Updated

    Rs.2174 Million New Injection Moulding Unit in Tirupati, Andhra Pradesh

    Andhra Pradesh From 1000 Million to 4999 Million

    A new injection moulding unit is proposed at Sricity, Peddaetipakkam Village, Satyavedu Mandal in Tirupati District, Andhra Pradesh, with an estimated project cost of ₹2,174 million. The facility will manufacture AC Cover, RF Cover and CW Cover components, each with an installed capacity of 25,000 Kg/day, using raw materials such as ABS, Polypropylene, Polyethylene, HIPS and PET. The State Pollution Control Board has granted Consent to Establish for the project, which is currently at the environmental clearance stage.

    View project
  5. Environment Clearance Stage Environment Updated

    Health Care Facility in Guntur District, Andhra Pradesh

    Andhra Pradesh NA

    A new hospital with a bed strength of 125 is being set up at Tadepalli, near Ashramam Road, Guntur District, Andhra Pradesh. The facility will include an Effluent Treatment Plant of 50 KLD capacity and a DG set of 250 KVA. The State Pollution Control Board has granted Consent to Establish for the project

    View project