New Hazardous Waste Incinerator Facility in Chikkaballapur, Karnataka
Executive Summary: A new hazardous waste incinerator facility with a 500 kg/hr capacity is planned in Kudumalakunte Industrial Area, Chikkaballapur, Karnataka, with an estimated cost of Rs.30 million. Construction is scheduled from June 2024 to June 2025. The project, submitted for environmental clearance in December 2023, reflects a commitment to advanced waste management and adherence to regulatory standards, contributing to environmental sustainability and responsible industrial practices in the region.
-
Industry: Environment
State: Karnataka
Investment Range: Less than 100 Million
16 April 2025

Rs.1250 Million New Integrated Common Hazardous Waste Treatment Facility in Vadodara, Gujarat
Executive Summary: A new integrated hazardous waste treatment facility is planned in Dungrapura Village, Savli Taluka, Vadodara, Gujarat. It includes a 10,00,000 TPA secured landfill, 1,00,000 TPA AFRF/Pre-Processing unit, and a 2,000 KLD leachate treatment plant. With an investment of Rs. 1,250 million, construction is scheduled from October 2025 to April 2026. Environmental clearance is currently under review.
-
Industry: Environment
State: Gujarat
Investment Range: From 1000 Million to 4999 Million
15 April 2025

New Material Recovery Facility in Bastar, Chhattisgarh
Executive Summary: A new Material Recovery Facility is being planned in Burandwada Semra, Tehsil Jagdalpur, Bastar, Chhattisgarh, with a processing capacity of 1,200 tonnes per year. As of April 2025, the necessary consent from the state pollution control authorities has been granted, enabling the establishment of the facility aimed at improving waste management and recycling operations.
-
Industry: Environment
State: Chhattisgarh
Investment Range: NA
09 April 2025

Rs.3715 Million New Water Treatment Plant in Shimla, Himachal Pradesh
Executive Summary: The Government of Himachal Pradesh plans to establish a new 42 MLD water treatment plant in Sakrodi, Shimla. The project, estimated at Rs. 3715.6 million, aims to enhance water supply and treatment capacity in the region. As of April 2025, the project has received the necessary consent from state pollution control authorities to proceed.
-
Industry: Environment
State: Himachal Pradesh
Investment Range: From 1000 Million to 4999 Million
08 April 2025

Rs.785 Million New Bio-CNG Plant in Madurai, Tamil Nadu
Executive Summary: The Government of Tamil Nadu plans to establish a 250 TPD Bio-CNG plant in Avaniyapuram, Madurai, under the PPP mode for 20 years. Estimated at Rs. 785.4 million, the project was awarded to a subsidiary of Refex Renewables & Infrastructure Limited. It aims to promote sustainable waste-to-energy solutions as part of the Swachh Bharat Mission Urban 2.0.
-
Industry: Environment
State: Tamil Nadu
Investment Range: From 100 Million to 999 Million
08 April 2025

Rs.234 Million New Common Biomedical Waste Treatment Facility Project in Pathanamthitta, Kerala
Executive Summary: A new common bio-medical waste treatment facility project is planned in Enadimangalam, Adoor, Pathanamthitta, Kerala. The project aims to set up a facility with a capacity of 20TPD. The estimated cost is Rs. 234 million. It is currently undergoing the environment clearance process with the State Level Environment Impact Assessment Authority.
-
Industry: Environment
State: Kerala
Investment Range: From 100 Million to 999 Million
28 March 2025

Sewage Treatment Plant Installation Project in South Goa, Goa
Executive Summary: A new iron ore pellet manufacturing project is planned near Borim Bridge, Shiroda, South Goa, with a target capacity of 1.8 MTPA. Feasibility studies, design finalization, and regulatory approvals have been underway since 2023. As of March 2025, the project includes a 10 KLD Sewage Treatment Plant and has received state pollution control clearance for establishment.
-
Industry: Environment
State: Goa
Investment Range: NA
25 March 2025

New Common Bio Medical Waste Treatment Facility in Hardwar, Uttarakhand
Executive Summary: A new Common Bio-Medical Waste Treatment Facility is planned in Roorkee, Uttarakhand, involving the expansion of an incinerator and utilities. With an estimated cost of ₹15 million, construction is set to begin in April 2025 and finish by July 2025. As of March 2025, the project is awaiting environmental clearance from the state authority.
-
Industry: Environment
State: Uttarakhand
Investment Range: Less than 100 Million
21 March 2025

Rs.3715 Million New Water Treatment Plant in Shimla, Himachal Pradesh
Executive Summary: A new water treatment plant is planned in Sakrodi, Block-Sunni, Shimla, to enhance water supply and infrastructure. With a capacity of 42 MLD, the project aims to meet rising demand. Estimated at Rs. 3715 million, it has received pollution control approval as of March 2025, ensuring improved water management and a reliable supply for residents.
-
Industry: Environment
State: Himachal Pradesh
Investment Range: From 1000 Million to 4999 Million
11 March 2025

New Waste Management Project in Jorhat, Assam
Executive Summary: A new waste management project is planned in Phukon Khat, Choukhat, Jorhat, Assam. It will involve setting up an incinerator (250 Kg/hr), autoclave (400 Kg/hr), and shredder (400 Kg/hr). The estimated cost is Rs. 95 million. As of March 2025, consent has been granted by state pollution control authorities to establish the project.
-
Industry: Environment
State: Assam
Investment Range: Less than 100 Million
11 March 2025