728 upcoming and ongoing cement projects in India worth ₹459,724 Cr, with investment, location, project stage and latest status. Last updated 06 Oct 2026.
A cement manufacturing project is set to commence in Govindapuram, Ariyalur, Tamil Nadu, with a capacity of 4 MTPA. Consent from state pollution control authorities was obtained as of February 2024
A new White Cement Manufacturing Project is planned in Halol Maswad Industrial Estate, Gujarat, by an undisclosed company. The project aims to produce 158,000 TPA of white cement through clinker grinding, with an estimated cost of Rs.390 million. Construction is set to commence in December 2024, concluding by December 2025. As of February 2024, the project is under review for environmental clearance, highlighting the company's commitment to responsible and sustainable manufacturing practices.
A manufacturing expansion project in Mappedu, Tiruvallur, Tamil Nadu, aims to increase production capacity for tiles, masonry mortar, grouts, skim coat, gypsum plasters, and various building materials. The company, having obtained consent from state pollution control authorities in February 2024, is set to enhance its capabilities to meet the rising demand for construction materials.
A limestone and clay extraction project is proposed in Meghalaya, covering 6.7892 hectares. The plan includes a peak Run of Mine quantity of 358,369.01 metric tons annually, emphasizing responsible mining practices. The estimated cost is Rs. 80.45 million, with construction scheduled from January 2024 to December 2073. The project has been referred to the State Level Environment Impact Assessment Authority in February 2024, highlighting a commitment to stringent environmental standards and sustainable resource development.
In Aligarh, Uttar Pradesh, a major cement manufacturing project is underway, led by a company. The project involves producing PPC and OPC cements with capacities of 73,500 and 31,500 Metric Tonnes/Day, respectively. Consent for project establishment was obtained from state pollution control authorities in May 2018. As of January 2024, a substantial expansion of the existing Clinker Grinding Unit's capacity to 4.5 Million TPA, requiring a Rs.3,500 million investment, is under consideration for environmental clearance.