Pre Project Stage Thermal Power & Grid Infrastructure Projects Private Sector
Rs.1250 Million captive thermal power plant coming up at Ramgarh, Jharkhand
- Investment
- From 1000 Million to 4999 Million
- Stage
- Pre Project Stage
- Location
- Ramgarh, Jharkhand
- Last updated
- 23 Sep 2026
Project summary
A 25 MW CFBC-based coal-fired captive thermal power plant is proposed within an existing integrated steel manufacturing complex to meet in-house electricity requirements. The proposal has been accepted and referred to the Expert Appraisal Committee by the Ministry of Environment, Forest and Climate Change for review. Non-forest land of 8.09 hectares has already been acquired for the project within the existing industrial premises.
Project details
| Segment | Thermal Power & Grid Infrastructure Projects |
|---|---|
| Industry | Power Generation |
| Products & capacity | CFBC Based Captive Thermal Power (25 MW) |
| District | Ramgarh |
| State | Jharkhand |
| Investment | From 1000 Million to 4999 Million |
| Project type | New |
| Ownership | Private Sector |
| Stage | Pre Project Stage |
| Last updated | 23 Sep 2026 |
| Promoter / company | 🔒 Subscribers only Unlock |
| Site location & address | 🔒 Subscribers only Unlock |
| Promoter contact | 🔒 Subscribers only Unlock |
| Decision makers | 🔒 Subscribers only Unlock |
| Milestone history | 🔒 Subscribers only Unlock |
Get the full picture on this project
Unlock promoter details, exact site address, decision-maker contacts and milestone updates.