Thermal Power & Grid Infrastructure Projects in Jharkhand

25 upcoming and ongoing thermal power & grid infrastructure projects in Jharkhand worth ₹106,122 Cr, with investment, location, project stage and latest status. Last updated 23 Sep 2026.

Projects tracked
25
Total investment
₹106,122 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
1

Latest thermal power & grid infrastructure projects in Jharkhand

Showing 1–5 of 25
  1. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    Rs.1250 Million captive thermal power plant coming up at Ramgarh, Jharkhand

    Jharkhand From 1000 Million to 4999 Million

    A 25 MW CFBC-based coal-fired captive thermal power plant is proposed within an existing integrated steel manufacturing complex to meet in-house electricity requirements. The proposal has been accepted and referred to the Expert Appraisal Committee by the Ministry of Environment, Forest and Climate Change for review. Non-forest land of 8.09 hectares has already been acquired for the project within the existing industrial premises.

    View project
  2. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    Rs.210000 Million New Ultra Supercritical Power Plant in Jharkhand

    Jharkhand More than 49999 Million

    A joint venture is planning to set up a 1,600 MW (2×800 MW) Ultra-Supercritical Thermal Power Plant in Jharkhand with an investment of ₹210,000 million. The project aims to enhance energy security and infrastructure development. As of November 2025, planning and regulatory processes are underway following a formal partnership established in April 2025.

    View project
  3. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.18422 Million New Transmission Systems Implementation Project in Jharkhand

    Jharkhand From 5000 Million to 49999 Million

    A transmission systems project in Latehar, Ranchi, and Ramgarh, Jharkhand, will establish 400/220/132/33 kV lines and substations under the Jharkhand Consultancy Project. Estimated at Rs. 18,422.5 million, it is being developed via the EPC route. Construction is set to finish by March 2026 and, as of August 2025, has reached the “Notice to Proceed” stage.

    View project
  4. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.7973 Million New Flue Gas Desulphurisation Unit in Bokaro, Jharkhand

    Jharkhand From 5000 Million to 49999 Million

    A new Flue Gas Desulphurisation Unit is planned in Chandrapura, Bokaro, Jharkhand, targeting below 500 MW units (2x250 MW) of CTPS Unit 7 and 8. The project is estimated to cost Rs. 7,973.5 million, with construction scheduled to begin in December 2024 and conclude by May 2027, developed through the EPC route.

    View project
  5. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    New Thermal Power Project in Jharkhand

    Jharkhand NA

    A new thermal power project is planned in Koderma, Jharkhand, involving the setup of a 2*800 MW Supercritical Thermal Power Plant. Awarded through International Competitive Bidding, the 1,600 MW project has been secured on an EPC basis from Damodar Valley Corporation. As of August 2024, preparations are underway to advance this significant energy initiative.