Thermal Power & Grid Infrastructure Projects in India – Page 40

561 upcoming and ongoing thermal power & grid infrastructure projects in India worth ₹2,663,844 Cr, with investment, location, project stage and latest status. Last updated 28 Sep 2026.

Projects tracked
561
Total investment
₹2,663,844 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
4

Latest thermal power & grid infrastructure projects in India

Showing 196–200 of 561
  1. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.11929 Million Coal based Thermal Power Plant Expansion Project in Odisha

    Odisha From 5000 Million to 49999 Million

    A coal-based thermal power plant expansion project is planned in Kamalanga, Odisha. Phase-II involves adding a 1x350 MW Imported Coal based Thermal Power Plant. Estimated cost: Rs. 11,929.8 million. Construction spans Nov to Dec 2023. The project received acceptance from India's Ministry of Environment, Forest, and Climate Change and is under review by the Expert Appraisal Committee as of Oct 2023.

    View project
  2. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.31741 Million New Coal Based Thermal Power Expansion Plant in Jharsuguda, Odisha

    Odisha From 5000 Million to 49999 Million

    A coal-based thermal power plant expansion project is planned in Kondhava Bk, Pune, Maharashtra. This expansion aims to increase the plant's capacity from 1x350 MW to 2x350 MW, with an estimated cost of Rs. 31,741.7 million. Construction is set to begin in January 2024 and conclude in January 2025. As of October 2023, the project is awaiting environmental clearance from the Ministry of Environment, Forest, and Climate Change in India.

    View project
  3. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    Rs.161 Million New Installation of Additional Husk Fired Boiler Unit in Sangareddy, Telangana

    Telangana From 100 Million to 999 Million

    A new husk-fired boiler project is planned in Sangareddy, Telangana, at a cost of Rs.161 million. It includes a 20 TPH capacity addition to an existing 18 TPH unit. As of September 2023, the project has received approval from state pollution control authorities.

    View project
  4. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    New Inter State Transmission System in Rajasthan

    Rajasthan NA

    A critical Inter-State Transmission System Project in Rajasthan, involving a 20 GW capacity for power evacuation from REZ, received a Letter of Intent in September 2023. It includes a 765/400kV substation with a STATCOM unit and 765kV D/C transmission line expansion.

    View project
  5. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.11670 Million New Transmission Scheme Project in Gujarat

    Gujarat From 5000 Million to 49999 Million

    A transmission scheme project in Ahmedabad, Gujarat, aims to evacuate 4.5GW of renewable energy injection at Khavda Power Station. The project, costing Rs. 11,670 million, commenced construction in March 2023 and is slated for completion by March 2025. As of September 2023, the project is in the "Notice to Proceed" stage and follows the EPC route.

    View project