Thermal Power & Grid Infrastructure Projects in India – Page 3

561 upcoming and ongoing thermal power & grid infrastructure projects in India worth ₹2,663,844 Cr, with investment, location, project stage and latest status. Last updated 28 Sep 2026.

Projects tracked
561
Total investment
₹2,663,844 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
4

Latest thermal power & grid infrastructure projects in India

Showing 11–15 of 561
  1. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    Rs.31600 Million New Upper Indravati Pumped Storage Project in Kalahandi, Odisha

    Odisha From 5000 Million to 49999 Million

    A 600 MW pumped storage project featuring four 150 MW reversible generating units is underway at Ranibahal, Kalahandi district, Odisha. Budgeted at Rs. 31,600 million, the project awarded its EPC contract Letter of Intent in July 2026 to begin on-site infrastructure work, targeting commercial commissioning by 2030.

    View project
  2. Recently Commissioned Thermal Power & Grid Infrastructure Projects Updated

    Rs.45000 Million Power Transmission Project in Kutch, Gujarat

    Gujarat From 5000 Million to 49999 Million

    A ₹4,500 crore power transmission project in Kutch, Gujarat, aims to integrate an additional 7 GW of renewable energy into the national grid. The project features advanced 765 kV GIS substations and STATCOM units for grid stability. As of March 2026, the initiative is awaiting environmental clearance, with construction scheduled for completion by August 2026.

    View project
  3. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    Rs.3510 Million New Ground Mounted Solar Photovoltaic Captive Power Plant in Angul, Odisha

    Odisha From 1000 Million to 4999 Million

    A major green energy initiative worth ₹3,510 million is planned in Angul, Odisha, to establish an additional 100 MW ground-mounted solar photovoltaic captive power plant. Aimed at powering group manufacturing operations via clean energy, the project secured formal investment approval from the State Level Single Window Clearance Authority in July 2026.

    View project
  4. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    Rs.1655 Million Gas Based Captive Power Plant in Dibrugarh, Assam

    Assam From 1000 Million to 4999 Million

    A state-backed petrochemical enterprise is setting up a new Rs. 1,655 million gas-based captive power plant in Dibrugarh, Assam. The infrastructure asset features a dedicated generation capacity of 11 MW to supply adjacent chemical processing units. Having secured formal state pollution control board clearances as of July 2026, the project is clearing the path for engineering procurement.

    View project
  5. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    Rs.4400 Million New Waste to Energy Power Plant in Kakinada, Andhra Pradesh

    Andhra Pradesh From 1000 Million to 4999 Million

    A new Waste-to-Energy power plant, featuring a 20 MWh capacity, is being established in Kakinada, Andhra Pradesh, with an investment of ?4,400 million. The project aims to enhance regional waste management and clean energy production. Having successfully secured the necessary consent from state pollution control authorities by April 2026, the venture is now moving forward with its implementation phase.

    View project