Thermal Power & Grid Infrastructure Projects in India – Page 25

561 upcoming and ongoing thermal power & grid infrastructure projects in India worth ₹2,663,844 Cr, with investment, location, project stage and latest status. Last updated 28 Sep 2026.

Projects tracked
561
Total investment
₹2,663,844 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
4

Latest thermal power & grid infrastructure projects in India

Showing 121–125 of 561
  1. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    Rs.5937 Million New Flue Gas Desulphurization Unit in Baran, Rajasthan

    Rajasthan From 5000 Million to 49999 Million

    A new flue gas desulphurization unit is set to be developed in Baran, Rajasthan, enhancing environmental compliance at the Chhabra Thermal Power Plant. With an estimated cost of ₹5,937.4 million, the project aims to reduce sulfur dioxide emissions from Units 1 to 4, starting construction in October 2024 and concluding in December 2026. Pre-project activities are currently in progress.

    View project
  2. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    Rs.97908 Million New Sipat Super Thermal Power Project in Chhattisgarh

    Chhattisgarh More than 49999 Million

    A new Sipat Super Thermal Power project is planned in Chhattisgarh, focusing on the expansion of Stage 3 with a capacity of 1*800 MW. The estimated cost of the project is Rs. 97,908 million. As of September 2024, an investment proposal has been approved by the board of directors, aimed at enhancing energy production to meet regional power demands.

    View project
  3. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    Rs.111309 Million New Darlipali Super Thermal Power Project in Odisha

    Odisha More than 49999 Million

    A new thermal power project is planned in Darlipali, Odisha, focusing on Stage 2 with a capacity of 1,800 MW. Estimated to cost Rs. 111,309.8 million, the project aims to enhance energy production to meet regional electricity demand. As of September 2024, investment approval has been received from the board of directors, paving the way for its execution.

    View project
  4. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.28210 Million New Transmission System in Gujarat

    Gujarat From 5000 Million to 49999 Million

    A new transmission system project is underway in Ahmedabad and Navsari, Gujarat, focusing on developing a transmission scheme for the evacuation of 4.5 GW of renewable energy from the Khavda Power Station, named KHAVDA II-C TRANSMISSION LIMITED. With an estimated cost of Rs. 28,210 million, construction began in March 2023 and is expected to finish by March 2025.

    View project
  5. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.14330 Million New Transmission System in Rajasthan

    Rajasthan From 5000 Million to 49999 Million

    A new transmission system project is underway in Sikar, Jodhpur, Rajasthan, aimed at enhancing electrical infrastructure linked to Long-Term Access applications from Rajasthan SEZ Part-E, Phase-II. With an estimated cost of Rs. 14,330 million, construction began in March 2023 and is expected to be completed by December 2024, utilizing the Engineering, Procurement, and Construction (EPC) route for efficient execution.

    View project