Thermal Power & Grid Infrastructure Projects in Telangana – Page 2

32 upcoming and ongoing thermal power & grid infrastructure projects in Telangana worth ₹104,209 Cr, with investment, location, project stage and latest status. Last updated 15 Jun 2026.

Projects tracked
32
Total investment
₹104,209 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
0

Latest thermal power & grid infrastructure projects in Telangana

Showing 6–10 of 32
  1. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    Rs.10000 Million New Sub Station Construction Project in Zaheerabad, Telangana

    Telangana From 5000 Million to 49999 Million

    A new 33 MW substation is planned in the National Investment and Manufacturing Zone, Zaheerabad, Telangana, on a 43-acre site. The project, estimated to cost Rs. 10,000 million, is currently in the pre-project phase as of July 2024, with activities including land acquisition, regulatory approvals, and preliminary design work underway.

    View project
  2. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    Rs.1300 Million Waste Heat Recovery Power Plant in Suryapet, Telangana

    Telangana From 1000 Million to 4999 Million

    An expansion of a Waste Heat Recovery Power Plant in Sitapuram, Telangana, will increase its capacity by 10 MW. The Rs. 1,300 million project aims to enhance energy efficiency using waste heat from cement production. As of July 2024, the project has received state pollution control consent to proceed.

    View project
  3. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.163262 Million Telangana Super Thermal Power Expansion Project in Telangana

    Telangana More than 49999 Million

    A major power expansion project is planned in Telangana, involving the development of a 3*800 MW Super Thermal Power facility. Located in Ramagundam, Peddapalli, the project aims to enhance existing infrastructure, with coordinates spanning 18º 44’ 47’’ N to 18º 45’ 30’’ N latitude and 79º 28’ 06’’ E to 79º 28’ 36’’ E longitude. The estimated cost is Rs.163,262 million, with construction scheduled from January 2025 to August 2030.

    View project
  4. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.15995 Million New Coal based Thermal Power Plant in Suryapet, Telangana

    Telangana From 5000 Million to 49999 Million

    A 300 MW (2 X 150 MW) coal-based thermal power plant in Vellaturu, Telangana, with an estimated cost of Rs.15995.4 million. Submitted to the Ministry of Environment, Forest, and Climate Change in December 2023, the project is currently under examination for environmental clearance.

    View project
  5. Project Work Commenced Thermal Power & Grid Infrastructure Projects Updated

    Rs.161 Million New Installation of Additional Husk Fired Boiler Unit in Sangareddy, Telangana

    Telangana From 100 Million to 999 Million

    A new husk-fired boiler project is planned in Sangareddy, Telangana, at a cost of Rs.161 million. It includes a 20 TPH capacity addition to an existing 18 TPH unit. As of September 2023, the project has received approval from state pollution control authorities.

    View project