Steel Projects in Chhattisgarh – Page 2

350 upcoming and ongoing steel projects in Chhattisgarh worth ₹278,240 Cr, with investment, location, project stage and latest status. Last updated 01 Oct 2026.

Projects tracked
350
Total investment
₹278,240 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
4

Latest steel projects in Chhattisgarh

Showing 6–10 of 350
  1. Pre Project Stage Steel Projects Updated

    Rs.4620 Million Greenfield Integrated Steel Plant in Raipur, Chhattisgarh

    Chhattisgarh From 1000 Million to 4999 Million

    A greenfield integrated steel complex is planned near Raipur, Chhattisgarh, featuring twin 350 TPD DRI kilns, induction/reheating furnaces, a rerolling mill, a galvanizing line, a captive 35 MW power plant and a fly ash brick unit. The project is currently at the ToR (Terms of Reference) stage with the Ministry of Environment, Forest and Climate Change, with a query/clarification pending on the application. Land (9.907 Ha, non-forest, government-allotted) has already been secured from the Chhattisgarh State Industrial Development Corporation.

    View project
  2. Pre Project Stage Steel Projects Updated

    Rs.10657 Million Greenfield Integrated Steel & Power Plant in Raipur, Chhattisgarh

    Chhattisgarh From 5000 Million to 49999 Million

    A greenfield integrated steel complex is proposed in Raipur district, Chhattisgarh, comprising sponge iron, iron ore beneficiation and pelletization, rotary hearth furnace, MS billets, rolled steel, ferro alloys, GI pipe/wire, fly ash bricks and a 50 MW captive power plant. The proposal is currently under examination by the Ministry of Environment, Forest and Climate Change for grant of Terms of Reference. Total project cost is estimated at ₹10,657.7 million on 25.958 hectares of non-forest land.

    View project
  3. Environment Clearance Stage Steel Projects Updated

    Steel Casting and Forging Unit Expansion Project in Bhilai, Chhattisgarh

    Chhattisgarh NA

    An existing ferrous steel casting, forging, fabrication, machining and allied products unit at Bhilai is being expanded to enhance capacities across castings, forgings, fabrication, machining, mechanical spares, ingots and moulds. The State Pollution Control Board has granted Consent to Establish for the expansion within the existing plant area of 2.397 acres. Construction/expansion activity is expected to commence following this approval.

    View project
  4. Environment Clearance Stage Steel Projects Updated

    Iron Ore Pellet Plant Expansion Project in Balodabazar-Bhatapara, Chhattisgarh

    Chhattisgarh NA

    A major industrial expansion in Bhatapara, Chhattisgarh, involves setting up a 760,000 TPA sponge iron plant, increasing pellet production to 2,300,000 TPA, reconfiguring coal gasifiers (80,000 Nm³/hr capacity), and scaling up ferro alloy and pig iron capacities. As of August 2026, mandatory Consent to Establish clearances have been received from state pollution control authorities.

    View project
  5. Environment Clearance Stage Steel Projects Updated

    Re-Rolled Steel Products Mfg. Expansion Projects in Raipur, Chhattisgarh

    Chhattisgarh NA

    A steel products manufacturing facility in Raipur, Chhattisgarh, is undergoing a major expansion. The project increases reheating furnace-based re-rolled steel capacity to 1,09,000 TPA and MS pipe fabrication steel strips to 1,80,000 TPA, alongside producing MS billets and slag-based bricks. As of July 2026, the project has received consent to establish from state pollution control authorities.

    View project