Steel Projects in Maharashtra

194 upcoming and ongoing steel projects in Maharashtra worth ₹397,429 Cr, with investment, location, project stage and latest status. Last updated 28 Sep 2026.

Projects tracked
194
Total investment
₹397,429 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
2

Latest steel projects in Maharashtra

Showing 1–5 of 194
  1. Pre Project Stage Steel Projects Updated

    Rs.183000 Million Integrated Steel Plant in Gadchiroli, Maharashtra

    Maharashtra More than 49999 Million

    A proposed greenfield integrated steel plant with 6.0 million TPA finished steel capacity and a 1420 MW captive power plant is planned across multiple villages in Chamorshi taluka, Gadchiroli district, Maharashtra. The project spans 981 hectares of non-forest land and is currently under environmental review with the Ministry of Environment, Forest and Climate Change (Fresh ToR stage, EDS raised). Once operational, it is expected to generate significant permanent and contractual employment during both construction and operational phases.

    View project
  2. Pre Project Stage Steel Projects Updated

    Rs.109240 Million Integrated Steel Plant at Wardha, Maharashtra.

    Maharashtra More than 49999 Million

    A new 3.5 MTPA integrated steel plant featuring Basic Oxygen Furnace, LRF, Hot Metal De-sulphurisation, RH Degasser, Thin Slab Caster and an Air Separation Unit is proposed at Barbadi and Inzapur villages in Wardha district, Maharashtra. The project involves an investment of Rs. 109240 Million and is currently under examination for grant of Terms of Reference by the Ministry of Environment, Forest and Climate Change. It is an interlinked greenfield unit alongside an existing expansion project of an associate steel company at the same location.

    View project
  3. Pre Project Stage Steel Projects Updated

    Rs.123674 Million Expansion and Modernization of Integrated Steel Plant in Wardha, Maharashtra.

    Maharashtra More than 49999 Million

    An integrated steel plant is being expanded and modernized through capacity enhancement of the blast furnace, sinter plant, coke oven plant and captive power plant, along with addition of a new 2300 Cum blast furnace, 220 Sqm sinter plant, 0.2 MTPA coke oven plant, 2.0 MTPA ground granulated blast furnace slag plant and a 1500 TPD oxygen (air separation) plant. The proposal is currently under examination by the Ministry of Environment, Forest and Climate Change for Terms of Reference, with construction yet to commence.

    View project
  4. Pre Project Stage Steel Projects Updated

    Rs.79600 Million Steel Plant Expansion Project in Chandrapur, Maharashtra

    Maharashtra More than 49999 Million

    A major energy and materials player is constructing a large-scale manufacturing plant at MIDC Bhadrawati, Maharashtra, backed by a prior ₹103,190 million MoU. Originally planned in 2025 for ₹38,520 million, an August 2026 expansion boosted the investment to ₹79,600 million. Key upgrades include increased gasification, DRI, and steel furnace capacities. MoEFCC environmental clearance has been granted, shifting construction to August 2027–August 2029.

    View project
  5. Pre Project Stage Steel Projects Updated

    Rs.53737 Million Expansion of CRGO Electrical Steel Plant Capacity at Nashik, Maharashtra

    Maharashtra More than 49999 Million

    Expansion of an existing Cold Rolled Grain Oriented (CRGO) electrical steel manufacturing facility at Wadivarhe, Igatpuri, Nashik, raising production capacity from 3,05,000 MT/A to 4,00,000 MT/A. The proposal is currently under examination by the Ministry of Environment, Forest and Climate Change for grant of Terms of Reference. Total project cost is estimated at ₹5,373.73 crore, including the existing investment of ₹696.73 crore and proposed expansion outlay of ₹4,677 crore.

    View project