Projects in Karnataka – Page 5

2,083 upcoming and ongoing projects in Karnataka worth ₹1,471,814 Cr, with investment, location, project stage and latest status. Last updated 07 Oct 2026.

Projects tracked
2,083
Total investment
₹1,471,814 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
10

Latest projects in Karnataka

Showing 21–25 of 2,083
  1. Pre Project Stage Distillery / Ethanol Updated

    Rs.4450 Million Ethanol/ENA/RS Distillery Expansion Project in Bagalkot, Karnataka

    Karnataka From 1000 Million to 4999 Million

    An existing ethanol distillery is being scaled up from 200 KLPD to 700 KLPD of ENA/Rectified Spirit/Ethanol, adding capability for ethanol-based chemicals and Sustainable Aviation Fuel using a multifeed stock of cane syrup, molasses, and grain. The co-generation power plant is being expanded from 3 MW to 13 MW, alongside CO2 and DDGS by-product capacity increases. The Rs 695 crore project in Badami taluk, Bagalkot district, is currently under environmental examination with a fresh Terms of Reference application filed.

    View project
  2. Pre Project Stage Highways / Roads Updated

    Rs.8100 Million New Elevated Corridor Construction Project in Karnataka

    Karnataka From 5000 Million to 49999 Million

    A new elevated corridor is proposed from Sirsi Circle to Nayandahalli on Mysuru Road in Bengaluru City, spanning about 8.67 hectares of non-forest land with minimal land acquisition along the existing road alignment. The project is a greenfield initiative intended to decongest a heavily trafficked corridor and improve city connectivity. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change, with construction yet to commence.

    View project
  3. Pre Project Stage Pharmaceuticals Projects Updated

    Rs.1507 Million Bulk Drugs Expansion Project in Bidar District, Karnataka

    Karnataka From 1000 Million to 4999 Million

    A pharmaceutical manufacturing unit at Humnabad, Bidar, Karnataka is proposing a change in product mix, discontinuing 18 existing products while retaining 4 with revised capacities and adding 32 new products including custom synthesis products. The ₹150.70 crore project involves an additional 1.17 hectares of non-forest land alongside the existing 3.63 hectares, raising total permanent operational employment from 130 to 205. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change for environmental clearance.

    View project
  4. Pre Project Stage Environment Updated

    Rs.730 Million Wenlock District Hospital Expansion Project in Dakshina Kannada, Karnataka

    Karnataka From 100 Million to 999 Million

    A district hospital in Mangaluru is undertaking a major expansion, increasing built-up area from 63,155 sq.m to 78,489 sq.m across a 5.27 hectare plot, raising bed capacity to 705. The project includes demolition of 3 existing buildings, construction of a new OPD block and additional floors to the Super Specialty Medicine Block. The proposal is currently under environmental verification with the Ministry of Environment, Forest and Climate Change, with physical construction yet to commence.

    View project
  5. Pre Project Stage Highways / Roads Updated

    Rs.7250 Million Construction of Elevated Corridors in Karnataka

    Karnataka From 5000 Million to 49999 Million

    A 6.8 km network of elevated corridors and a loop flyover is proposed to link Minerva Circle, Hudson Circle, Town Hall, Sangolli Rayanna Circle (Anand Rao Flyover) and Nrupathunga Road (KR Circle) in Bengaluru City. The project is designed to ease congestion on the existing road network and integrate with the BGS Flyover and proposed elevated rotary at Hudson Circle. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change, with land acquisition in process and no physical construction started yet.

    View project