Pre Project Stage Distillery / Ethanol Private Sector
Rs.4450 Million Ethanol/ENA/RS Distillery Expansion Project in Bagalkot, Karnataka
- Investment
- From 1000 Million to 4999 Million
- Stage
- Pre Project Stage
- Location
- Bagalkote, Karnataka
- Last updated
- 25 Aug 2026
Project summary
An existing ethanol distillery is being scaled up from 200 KLPD to 700 KLPD of ENA/Rectified Spirit/Ethanol, adding capability for ethanol-based chemicals and Sustainable Aviation Fuel using a multifeed stock of cane syrup, molasses, and grain. The co-generation power plant is being expanded from 3 MW to 13 MW, alongside CO2 and DDGS by-product capacity increases. The Rs 695 crore project in Badami taluk, Bagalkot district, is currently under environmental examination with a fresh Terms of Reference application filed.
Project details
| Segment | Distillery / Ethanol |
|---|---|
| Industry | Distillery |
| Products & capacity | ENA/RS/Ethanol (from 200 KLPD to 700 KLPD) |
| District | Bagalkote |
| State | Karnataka |
| Investment | From 1000 Million to 4999 Million |
| Project type | Expansion |
| Ownership | Private Sector |
| Stage | Pre Project Stage |
| Last updated | 25 Aug 2026 |
| Promoter / company | 🔒 Subscribers only Unlock |
| Site location & address | 🔒 Subscribers only Unlock |
| Promoter contact | 🔒 Subscribers only Unlock |
| Decision makers | 🔒 Subscribers only Unlock |
| Milestone history | 🔒 Subscribers only Unlock |
Get the full picture on this project
Unlock promoter details, exact site address, decision-maker contacts and milestone updates.