Projects in Karnataka – Page 6

2,083 upcoming and ongoing projects in Karnataka worth ₹1,471,814 Cr, with investment, location, project stage and latest status. Last updated 07 Oct 2026.

Projects tracked
2,083
Total investment
₹1,471,814 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
10

Latest projects in Karnataka

Showing 26–30 of 2,083
  1. Pre Project Stage Highways / Roads Updated

    Rs.7160 Million New Elevated Corridor Construction Project in Karnataka

    Karnataka From 5000 Million to 49999 Million

    A proposed elevated corridor spanning from Shooley Circle to St. John Hospital Road along Hosur Road, routed via Anepalya Junction and Adugodi Junction within Bengaluru Central and South City Corporation limits. The project is currently under verification with the Ministry of Environment, Forest and Climate Change for fresh Environmental Clearance under Category B2. Construction is yet to commence pending clearance.

    View project
  2. Pre Project Stage Hotels / Hospitality Updated

    Rs.1091 Million New Hotel Construction Project in Bengaluru East, Karnataka

    Karnataka From 1000 Million to 4999 Million

    A non-residential (hotel) building project spanning approximately 48,378 sqmt is proposed on 3.48 hectares of privately-owned commercial land in Bengaluru East. The proposal, categorized as B2 under the EIA Notification 2006, has been accepted and referred to the State Expert Appraisal Committee (SEAC) for review by the Ministry of Environment, Forest and Climate Change. Construction is yet to commence, with the project expected to generate around 650 man-days of employment during the construction phase and 350 man-days during operations.

    View project
  3. Pre Project Stage Highways / Roads Updated

    Rs.3800 Million New Elevated Rotary Flyover in Bangalore, Karnataka

    Karnataka From 1000 Million to 4999 Million

    A new elevated rotary flyover is planned at the IOC Junction in Bengaluru, along with an additional 2-lane road-over-bridge at the Byyappanahalli railway level crossing. The project passes through a dense mixed-use urban corridor near the SMVT Railway Station and major arterial roads, aiming to improve traffic mobility and regional connectivity. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change ahead of Environmental Clearance.

    View project
  4. Pre Project Stage Vehicle Assembly Updated

    Rs.6000 Million Factory-E, EV Two Wheeler & Parts

    Karnataka From 5000 Million to 49999 Million

    A new industrial shed/building spanning roughly 23,050 sqmtr built-up area is proposed within the Jakkasandra Industrial Area near Narsapura, Malur, Karnataka, to house assembly of EV two-wheelers and related parts. The project is currently under verification with MoEFCC for fresh Environmental Clearance and is at the planning/land-acquisition stage, with Consent to Establish yet to be obtained. Expected to generate significant employment once operational, with around 900 permanent jobs.

    View project
  5. Announcement Stage Other Manufacturing Updated

    Gravure Cylinders Mfg. Expansion Project in Karnataka

    Karnataka Less than 100 Million

    A planned manufacturing expansion in Karnataka entails an estimated investment of Rs. 67.1 million to produce over 18,000 gravure cylinders annually. Fully funded through internal accruals, the capital expenditure splits funds between state-of-the-art machinery and facility setup costs, with commercial operations slated to commence during fiscal year 2026–2027.

    View project