Projects in Uttar Pradesh – Page 11

1,364 upcoming and ongoing projects in Uttar Pradesh worth ₹2,282,472 Cr, with investment, location, project stage and latest status. Last updated 08 Oct 2026.

Projects tracked
1,364
Total investment
₹2,282,472 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
14

Latest projects in Uttar Pradesh

Showing 51–55 of 1,364
  1. Under Implementation Highways / Roads Updated

    Rs.39324 Million New 4 Lane Highway Construction Project in Barabanki, Uttar Pradesh

    Uttar Pradesh From 5000 Million to 49999 Million

    A public highway authority is executing a 43.030-km, four-lane expansion on the NH-927 section from Barabanki to Mustafabad in Uttar Pradesh under the Hybrid Annuity Mode. Managed by a designated independent engineering consultant and valued at Rs. 39,324 million, the access-controlled logistics corridor has transitioned into its structural implementation stage as of June 2026.

    View project
  2. Under Implementation Highways / Roads Updated

    Rs.9396 Million New Chitrakoot Link Expressway Project in Chitrakoot, Uttar Pradesh

    Uttar Pradesh From 5000 Million to 49999 Million

    UPEIDA is executing the Rs. 9,396.7 million greenfield Chitrakoot Link Expressway from Bharatkoop (Chainage 0+000) to Ahmad Ganj, Karwi (Chainage 15.172) in Uttar Pradesh. The 15.17-km access-controlled, 4-lane asset expands to 6 lanes and includes 5 bridges and 17 underpasses. Construction spans December 2026 to May 2028, with SEIAA environmental appraisal currently underway.

    View project
  3. Under Implementation Logistics Park / Industrial Park Updated

    Rs.2883 Million New Integrated Manufacturing & Logistic Cluster in Budaun, Uttar Pradesh

    Uttar Pradesh From 1000 Million to 4999 Million

    A state-backed infrastructure agency is launching a Rs. 2,883.6 million greenfield Integrated Manufacturing & Logistic Cluster across 269 acres in Sadar, Budaun, Uttar Pradesh. Situated near the Ganga Expressway, the hub caters to manufacturing and freight logistics. Planned for construction between April 2027 and March 2028, the industrial node currently awaits state environmental clearance.

    View project
  4. Under Implementation Distillery / Ethanol Updated

    Rs.4677 Million New Grain based Ethanol Distillery Plant in Gorakhpur, Uttar Pradesh

    Uttar Pradesh From 1000 Million to 4999 Million

    An industrial expansion project is planned for the Dhuriyapar Industrial Area, Gorakhpur, Uttar Pradesh. It features a 750 KLD grain-based ethanol plant, a 20 KLD malt distillery, and a 15 MW co-generation power unit. Costing Rs. 4,677.5 million, environmental clearance is pending, with construction targeted to run from September 2026 to September 2027.

    View project
  5. Pre Project Stage Renewable Power Projects Updated

    Rs.13380 Million New Solar Photovoltaic Power Project in Sitapur, Uttar Pradesh

    Uttar Pradesh From 5000 Million to 49999 Million

    A Rs. 13,380.3 million hybrid energy project featuring a 250 MW solar plant and 50 MW/200 MWh battery storage system is being built in Sitapur, Uttar Pradesh. As of June 2026, an EPC contract was officially awarded to construct the entire clean energy infrastructure, with a definitive deployment timeline set for 18 months.

    View project