Thermal Power & Grid Infrastructure Projects in Uttar Pradesh

22 upcoming and ongoing thermal power & grid infrastructure projects in Uttar Pradesh worth ₹144,109 Cr, with investment, location, project stage and latest status. Last updated 19 Sep 2025.

Projects tracked
22
Total investment
₹144,109 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
0

Latest thermal power & grid infrastructure projects in Uttar Pradesh

Showing 1–5 of 22
  1. Pre Project Stage Thermal Power & Grid Infrastructure Projects Updated

    Rs.123650 Million Khurja Super Thermal Power Plant Expansion Project in Bulandshahr, Uttar Pradesh

    Uttar Pradesh More than 49999 Million

    A major power company is planning to expand its Khurja Super Thermal Power Plant in Bulandshahr, Uttar Pradesh, adding a single 800 MW unit under Stage-II. The project is estimated at ₹123,650 million. As of September 2025, environmental clearance has been applied for with the Ministry of Environment, Forest and Climate Change (MoEF&CC) to proceed with the expansion.

    View project
  2. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.2128 Million New Transmission System Strengthening Project in Bareilly, Uttar Pradesh

    Uttar Pradesh From 1000 Million to 4999 Million

    A new transmission system strengthening project is planned in Bareilly, Uttar Pradesh, to improve power evacuation from the Bhadla/Bikaner complex. With an estimated cost of Rs. 2,128.1 million, construction began in December 2024 and will conclude by June 2026. As of August 2025, it is at the “Notice to Proceed” stage and follows the EPC route.

    View project
  3. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.125570 Million Prayagraj Power Generation Expansion Project in Prayagraj, Uttar Pradesh

    Uttar Pradesh More than 49999 Million

    A thermal power generation expansion project is planned in Bara, Prayagraj, Uttar Pradesh, involving the addition of 2×800 MW units to an existing 3×660 MW plant. The project will use additional 157.3 hectares, bringing the total to 751.4 hectares. With an estimated cost of ₹125,570 million, construction is set from August 2026 to July 2030. Environmental clearance is underway.

    View project
  4. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.239500 Million Thermal Power Plant Expansion Project in Lalitpur, Uttar Pradesh

    Uttar Pradesh More than 49999 Million

    A thermal power plant expansion project is planned in Lalitpur, Uttar Pradesh, involving the addition of a 2400 MW (3x800 MW) coal-based Ultra Super Critical unit to the existing 1980 MW plant, increasing the total capacity to 4380 MW. The project, estimated at Rs. 239,500 million, is set to begin in April 2026 and finish by March 2031.

    View project
  5. Under Implementation Thermal Power & Grid Infrastructure Projects Updated

    Rs.183000 Million New Coal based Ultra Super Critical Thermal Power Project in Uttar Pradesh

    Uttar Pradesh More than 49999 Million

    A new coal-based Ultra Super Critical Thermal Power Project is planned in Dadri Khurd, Uttar Pradesh, involving the construction of a 2x800 MW plant at an estimated cost of Rs. 183,000 million. Construction begins in April 2025, aiming for completion by March 2029. The project awaits environmental clearance from the Ministry of Environment, Forest and Climate Change of India as of April 2024.