Other Manufacturing Projects in Telangana – Page 5

163 upcoming and ongoing other manufacturing projects in Telangana worth ₹11,939 Cr, with investment, location, project stage and latest status. Last updated 02 Oct 2026.

Projects tracked
163
Total investment
₹11,939 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
3

Latest other manufacturing projects in Telangana

Showing 21–25 of 163
  1. Project Work Commenced Other Manufacturing Updated

    Rs.720 Million New Metal Fabrication Unit in Medchal-Malkajgiri, Telangana

    Telangana From 100 Million to 999 Million

    A ₹720 million metal fabrication unit is being established in Ghatkesar, Telangana. The facility specializes in advanced surface treatments, including electroplating and anodizing, to support high-precision engineering sectors. As of February 2026, the project has secured essential consent from state pollution control authorities, clearing the way for construction to begin in the Medchal-Malkajgiri industrial belt.

    View project
  2. Pre Project Stage Other Manufacturing Updated

    Rs.2796 Million New Pre Engineering Building Materials Mfg. Unit in Telangana

    Telangana From 1000 Million to 4999 Million

    A company plans to establish a new Pre-Engineered Building Materials Manufacturing Unit (Phase I) in Seetharampur, Nalgonda, Telangana, with an investment of ₹2,796.3 million. The project aims to boost building material production capacity, and as of November 2025, pre-project activities are underway.

    View project
  3. Project Work Commenced Other Manufacturing Updated

    Rs.189 Million Cable Making Machine Assembly Unit Expansion Project in Sangareddy, Telangana

    Telangana From 100 Million to 999 Million

    A cable-making machine assembly unit expansion is planned in Phase-III, Pashamailaram, Patancheru, Sangareddy, Telangana. The project aims to increase manufacturing capacity from 50 to 170 machines per annum and spare parts from 250 to 490 units per annum. Estimated at ₹189.5 million, the project has received state pollution control consent as of October 2025.

    View project
  4. Project Work Commenced Other Manufacturing Updated

    Rs.855 Million New Low Speed Maker Mfg. Unit in Medak, Telangana

    Telangana From 100 Million to 999 Million

    A company plans to set up a new manufacturing unit in IP Toopran, Medak, Telangana, producing low-speed makers (10 units/month), medium-speed makers (2 units/month), tax stampers (4 units/month), wrappers (4 units/month), and boxers (4 units/month). The project is estimated to cost Rs. 855 million. As of September 2025, consent from state pollution control authorities has been obtained.

    View project
  5. Under Implementation Other Manufacturing Updated

    New Footwear Sole Sheets Mfg. Project in Vikarabad, Telangana

    Telangana Less than 100 Million

    A company plans a new footwear sole sheets manufacturing project in Rakamcherla, Telangana, producing 50,000 sole sheets and 100,000 PVC soles per month, along with 300 mixing jobs for multinational clients monthly. The project, costing Rs. 98.983 million, includes plant, machinery, and infrastructure. As of September 2025, state pollution control consent has been obtained, ensuring environmental compliance.

    View project