Other Manufacturing Projects in Telangana – Page 6

163 upcoming and ongoing other manufacturing projects in Telangana worth ₹11,939 Cr, with investment, location, project stage and latest status. Last updated 02 Oct 2026.

Projects tracked
163
Total investment
₹11,939 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
3

Latest other manufacturing projects in Telangana

Showing 26–30 of 163
  1. Project Work Commenced Other Manufacturing Updated

    Rs.1979 Million New Liquid Vials Mfg. Unit in Siddipet, Telangana

    Telangana From 1000 Million to 4999 Million

    A company plans a new liquid vials manufacturing unit in Siddipet, Telangana, producing 12.5 million liquid vials and lyophilized vials each, 3.125 million prefilled syringes, and 3.125 million cartridges annually. The project, estimated at ₹1,979.8 million, has obtained consent from the state pollution control authorities as of September 2025, allowing the company to proceed with establishment.

    View project
  2. Project Work Commenced Other Manufacturing Updated

    Rs.230 Million Lamination Unit Expansion Unit in Rangareddy, Telangana

    Telangana From 100 Million to 999 Million

    A lamination unit in Elikatta, Farooqnagar, Telangana, is set for expansion, adding new products—High Pressure Decorative Laminates and Compact Laminates (5,000 units/day)—while continuing existing production of Paper Based Laminated Sheets (10,000 units/day) and Electrical Insulation Sheets (1,500 units/day). The project, costing Rs.230 million, has received state pollution control approval as of August 2025.

    View project
  3. Project Work Commenced Other Manufacturing Updated

    Rs.152 Million New Plywood and Block Boards Mfg. Project in Mahabubnagar, Telangnana

    Telangana From 100 Million to 999 Million

    A new plywood and block board manufacturing project is planned in Mothighanpur Village, Balanagar Mandal, Mahabubnagar, Telangana. The unit will produce UF, PF, and MF boards ranging from 4mm to 25mm, with a capacity of 7,500 units per day. The project, estimated at Rs. 152.4 million, received establishment consent from state pollution control authorities in August 2025.

    View project
  4. Project Work Commenced Other Manufacturing Updated

    Sheet Metal Mfg.Expansion Project in Sangareddy, Telangana

    Telangana Less than 100 Million

    A sheet metal manufacturing expansion project is planned at Mahindra Vendor Park, Buchinelly, Zaheerabad, Sangareddy, Telangana. The project aims to increase production capacity from 18,000 TPA to 20,000 TPA, with an estimated cost of Rs. 76.1 million. As of August 2025, the company has received approval from state pollution control authorities to establish the project.

    View project
  5. Project Work Commenced Other Manufacturing Updated

    Rs.595 Million Metal Injection Moulding Parts Mfg Unit in Rangareddy, Telangana

    Telangana From 100 Million to 999 Million

    A new metal injection moulding parts manufacturing unit is planned in IP General Park, Maheshwaram, Rangareddy, Telangana. With a proposed capacity of 40 tons per month, the project is estimated to cost ₹595.7 million. As of August 2025, necessary environmental clearances have been granted by state pollution control authorities, allowing the project to proceed toward establishment.

    View project