New & Upcoming Projects in Metallurgical Industries Projects in India – Page 6

3,053 upcoming and ongoing metallurgical industries projects in India worth ?43.17 lakh crore, with investment, location, project stage and latest status. Last updated 16 Oct 2026.

Projects tracked
3,053
Total investment
₹43.17 lakh crore
Projects above ₹100 Cr
1,127
Added in the last 30 days
29

Latest metallurgical industries projects in India

Showing 26–30 of 3,053
  1. Environment Clearance Stage Steel Projects Updated

    Iron Casting Expansion Project in Durg, Chhattisgarh

    Chhattisgarh NA

    An existing iron casting facility in Durg district, Chhattisgarh is undergoing expansion, raising its cast iron production capacity to 30,000 MT per annum alongside iron casting services capacity of 26,000 MT per annum. The State Pollution Control Board has granted Consent to Establish for the expansion under the Water and Air Acts.

    View project
  2. Environment Clearance Stage Non-Ferrous Metals Projects Updated

    Rs.640 Million Rare Earth Metal and Metal Coating Manufacturing Project in Pashamylaram, Sangareddy District, Telangana

    Telangana From 100 Million to 999 Million

    A new manufacturing facility is being set up to produce strip casting flakes, Neodymium Praseodymium metal, and nickel-copper-nickel, zinc coating and phosphating processes. The unit is located in IP-Pashamylaram, Phase-III, Sangareddy District with an investment of Rs. 640 Million. The State Pollution Control Board has granted Consent to Establish for the project, which is at the environmental clearance stage.

    View project
  3. Under Implementation Steel Projects Updated

    Rs.151 Million Ferrous Castings Manufacturing Expansion Project in Paschim Bardhaman, West Bengal

    West Bengal From 100 Million to 999 Million

    The State Pollution Control Board granted Consent to Establish for an expansion unit manufacturing ferrous castings with a capacity of 175 Metric Tonnes/Month. The project is located at Mouza Dhasal, Paschim Bardhaman district, West Bengal, with a total investment of Rs. 151.05 Million. The unit is currently at Environment Clearance stage.

    View project
  4. Project Work Commenced Steel Projects Updated

    Rs.379 Million Unit IV Capacity Expansion Project at Chambaghat, Solan, Himachal Pradesh.

    Himachal Pradesh From 100 Million to 999 Million

    A metallurgical and metal components manufacturing unit at Chambaghat, Solan is undergoing capacity expansion under Unit IV. The expansion covers iron & steel, copper products, other base metal products and related components. The project has received Consent to Establish from the State Pollution Control Board.

    View project
  5. Pre Project Stage Steel Projects Updated

    Rs.430 Million expansion of Pre-Engineered Building component manufacturing unit in Sabarkantha, Gujarat

    Gujarat From 100 Million to 999 Million

    Expansion of an existing industrial shed manufacturing Pre-Engineered Building (PEB) components made of MS steel, raising total capacity to 108,000 TPA at the plant in Bavsar, Sabarkantha district, Gujarat. The Environmental Clearance proposal (Category B2) is currently under verification with the Ministry of Environment, Forest and Climate Change.

    View project