  1. Project Work Commenced Non-Ferrous Metals Projects Updated

    Rs.899 Million Aluminium Foil Mfg. Expansion Project in Rangareddy, Telangana

    Telangana From 100 Million to 999 Million

    An aluminum foil manufacturing plant in Shabad, Telangana, is scaling up production capacity from 700 to 2,100 tonnes per month. Backed by an incremental investment of Rs. 899 million following its initial Rs. 1,339.7 million phase, the facility has secured vital state pollution control approvals to execute this massive footprint expansion.

    View project
  2. Project Work Commenced Steel Projects Updated

    Rs.5150 Million New Low Grade Iron Ore Mining Project in Prakasam, Andhra Pradesh

    Andhra Pradesh From 5000 Million to 49999 Million

    A state-owned mineral corporation is developing a massive 50,00,000 TPA open-cast low-grade iron ore mining project at Survey No. 388 in Prakasam, Andhra Pradesh. The Rs. 5,150 million infrastructure asset features an integrated beneficiation facility designed to produce 13,50,000 TPA of high-purity iron ore concentrates. As of July 2026, the project has received its statutory state pollution control consent.

    View project
  3. Under Implementation Steel Projects Updated

    Rs.40000 Million Steel Plant Expansion Project in Seraikela-Kharswan, Jharkhand

    Jharkhand From 5000 Million to 49999 Million

    A massive heavy-industry expansion project is planned in the Seraikela-Kharswan district of Jharkhand to establish a 1.431 MTPA integrated steel plant. Spanning 80.64 hectares, the Rs. 40,000 million complex features an integrated 255 MW captive power plant (WHRB and AFBC). Construction is slated from April 2027 to March 2034, and the project currently awaits statutory environmental clearance as of July 2026.

    View project
  4. Project Work Commenced Non-Ferrous Metals Projects Updated

    Rs.250 Million Electro Fused Ceramics Mfg. Project in Koraput, Odisha

    Odisha From 100 Million to 999 Million

    A new electro fused ceramics manufacturing project with a 20,000 MT/Y capacity is being established in Dasmantpur, Koraput, Odisha, at an estimated cost of Rs. 250 million. The project successfully secured its formal Consent to Establish from state pollution control board authorities in July 2026, allowing immediate progress into site construction.

    View project
  5. Under Implementation Steel Projects Updated

    Rs.3400 Million New Greenfield Steel Plant in Durg, Chhattisgarh

    Chhattisgarh From 1000 Million to 4999 Million

    A new Rs. 3,400 million greenfield steel plant is planned for Durg, Chhattisgarh. The facility will produce 175,200 TPA of sponge iron, 207,000 TPA of structural steel, and various ferro alloys. Featuring a 15 MW captive power plant, construction is set for July 2026 to June 2028. The project currently awaits environmental clearance from the MoEFCC.