New & Upcoming Projects in Infrastructure Projects in India – Page 10

4,286 upcoming and ongoing infrastructure projects in India worth ?63.45 lakh crore, with investment, location, project stage and latest status. Last updated 16 Oct 2026.

Projects tracked
4,286
Total investment
₹63.45 lakh crore
Projects above ₹100 Cr
2,642
Added in the last 30 days
38

Latest infrastructure projects in India

Showing 46–50 of 4,286
  1. Environment Clearance Stage Water Supply & Irrigation Projects Updated

    Rs.187 Million Salal Dam Reservoir Dredging Project in Doda district, Jammu & Kashmir

    Jammu and Kashmir From 100 Million to 999 Million

    The project involves extraction and dredging of river bed material including silt, sand, clay, pebbles, cobbles and boulders from the Salal Dam reservoir area. Consent to Establish has been granted by the State Pollution Control Board with a capital investment of Rs. 187.2 Million. The maximum dredging capacity is set at 525,000 cubic meters per month, with the project currently at the environmental clearance stage.

    View project
  2. Pre Project Stage Highways / Roads Updated

    Rs.116953 Million access-controlled expressway in Maharashtra.

    Maharashtra More than 49999 Million

    A new 204.799 km Access Controlled Super Communication Expressway (Package-3) is proposed connecting Nagpur and Chandrapur, running from Seldoh interchange on the Maharashtra Samruddhi Mahamarg to Ghugus interchange near Chandrapur, passing through Nagpur, Wardha, Chandrapur, Yavatmal and Gadchiroli districts. The Rs. 116953.1 Million project is currently at Terms of Reference stage under Category A of the EIA Notification 2006, with the proposal accepted and referred to the State Expert Appraisal Committee, and forest/NBWL clearance applications to follow post grant of ToR.

    View project
  3. Announcement Stage Railways / Metro Updated

    Rs.19360 Million rail doubling project adding third and fourth lines between Arakkonam and Renigunta, Tamil Nadu.

    Tamil Nadu From 5000 Million to 49999 Million

    A 77 km stretch between Arakkonam and Renigunta will get new third and fourth railway lines at an estimated cost of Rs. 19360 Million. The project includes construction of 12 major bridges and 221 minor bridges to support the expanded corridor. It has been approved by the Cabinet Committee on Economic Affairs to improve connectivity to SIDCO and SIPCOT industrial zones.

    View project
  4. Pre Project Stage Highways / Roads Updated

    Rs.38209 Million greenfield four-lane highway corridor to connect Chitrakoot with Prayagraj via Rajapur in Uttar Pradesh.

    Uttar Pradesh From 5000 Million to 49999 Million

    A 49.655-km four-lane, access-controlled greenfield corridor is proposed to connect Chitrakoot with Prayagraj via Rajapur at an estimated cost of Rs. 38209.6 Million. The corridor will bypass congested areas, reduce travel time and vehicle operating costs, and improve connectivity to Chitrakoot Dham while boosting agriculture, trade and tourism. Ministry-level alignment decisions have been taken and inter-departmental coordination for implementation is underway.

    View project
  5. Pre Project Stage Highways / Roads Updated

    Rs.7560 Million Double-Decker Elevated Road Corridor in Greater Noida/Ghaziabad.

    Uttar Pradesh From 5000 Million to 49999 Million

    A 2.5 km double-decker elevated road corridor, the first such project in Uttar Pradesh, has been cleared for the stretch between the Delhi-Meerut Expressway and Ek Murti Chowk. The first phase, costing Rs. 7560.1 Million, will be executed based on a detailed project report prepared by NHAI. The project aims to ease chronic traffic congestion linking Greater Noida West with the Delhi-Meerut Expressway, with a second phase planned for the remaining stretch.

    View project