New & Upcoming Projects in Distillery Projects in India

1,008 upcoming and ongoing distillery projects in India worth ?1.98 lakh crore, with investment, location, project stage and latest status. Last updated 14 Oct 2026.

Projects tracked
1,008
Total investment
₹1.98 lakh crore
Projects above ₹100 Cr
605
Added in the last 30 days
5

Latest distillery projects in India

Showing 1–5 of 1,008
  1. Pre Project Stage Distillery and Ethanol Updated

    Rs.1326 Million New Distillery Project in Beed district, Maharashtra

    Maharashtra From 1000 Million to 4999 Million

    A new 95 KLPD distillery is proposed at Kada Sakhar in Beed district, Maharashtra, to produce rectified spirit/ENA/ethanol from syrup and B-heavy/C-heavy molasses, along with CBG and potash-rich powder as by-products. The project includes a 2.5 MW biomass-based captive power unit and is currently under examination at the ToR stage with the Ministry of Environment, Forest and Climate Change. Construction has not yet commenced as the proposal is still undergoing regulatory review.

    View project
  2. Pre Project Stage Distillery and Ethanol Updated

    Rs.4230 Million Grain-Based Distillery Unit in Gondia district, Maharashtra

    Maharashtra From 1000 Million to 4999 Million

    A 500 KLPD grain-based distillery is proposed to produce fuel ethanol or a mix of ethanol and rectified spirit/ENA, supported by an 8.5 MW captive power plant. The project is currently under examination for Terms of Reference clearance from the Ministry of Environment, Forest and Climate Change, with no construction activity yet commenced. The unit will come up on an 8-hectare plot in the MIDC Deori industrial area of Maharashtra.

    View project
  3. Under Implementation Distillery / Ethanol Updated

    Rs.1100 Million distillery capacity expansion project in Aligarh, Uttar Pradesh

    Uttar Pradesh From 1000 Million to 4999 Million

    Expansion of an existing C-heavy molasses-based distillery from 90 KLPD to 120 KLPD, adding grains (broken rice) as raw material to produce Rectified Spirit/Extra Neutral Alcohol/Absolute Alcohol. The project is co-located with an existing 2.0 MW co-generation plant. Currently under examination by the Ministry of Environment, Forest and Climate Change for grant of Environmental Clearance.

    View project
  4. Pre Project Stage Distillery / Ethanol Updated

    Rs.9750 Million Grain Based Ethanol Plant Expansion Project in Darrang, Assam

    Assam From 5000 Million to 49999 Million

    Expansion of a grain-based ethanol distillery from 600 KLD to 1200 KLD (1000 KLD ethanol and 200 KLD ENA/RS), along with a co-generation power plant expansion from 15 MW to 28 MW, at the AIDCL Sipajhar Industrial Plot in Darrang district, Assam. Standard ToR has been granted by the Ministry of Environment, Forest and Climate Change for the expansion, while the existing 600 KLD unit is already operational under a valid Environmental Clearance and Consent to Operate. Physical expansion work is yet to commence at site.

    View project
  5. Pre Project Stage Distillery / Ethanol Updated

    Rs.4036 Million Expansion of Grain Ethanol Distillery in Khandwa, Madhya Pradesh

    Madhya Pradesh From 1000 Million to 4999 Million

    A grain-based ethanol distillery in Khandwa district, Madhya Pradesh is being expanded fivefold from 100 KLPD to 500 KLPD, with associated captive electricity generation capacity rising from 3 MW to 12 MW. The proposal has received Standard ToR from the Ministry of Environment, Forest and Climate Change, with the existing unit already holding a valid Environmental Clearance and operating consents.

    View project