Latest projects in Chhattisgarh

Showing 16–20 of 1,098
  1. Pre Project Stage Environment Updated

    Rs.1780 Million Shree Narayana Hospital Expansion Project in Raipur, Chhattisgarh

    Chhattisgarh From 1000 Million to 4999 Million

    A hospital facility is being expanded to increase bed capacity from 302 to 552 beds, with built-up area rising from about 12,910.80 sqm to 25,937.25 sqm. The project is currently under verification with the Ministry of Environment, Forest and Climate Change, with construction expected to commence around 2027.

    View project
  2. Under Implementation Steel Projects Updated

    Rs.4950 Million New Integrated Steel Plant in Bametara, Chhattisgarh

    Chhattisgarh From 1000 Million to 4999 Million

    A large integrated steel complex comprising DRI, steel melting shop, rolling mill, captive power plant, ferro alloy plant, wire drawing, fabrication, galvanizing and fly ash brick units is proposed in Bemetara district, Chhattisgarh. The proposal is currently under examination by the Ministry of Environment, Forest and Climate Change for fresh environmental clearance. Construction is yet to commence, with site works and rehabilitation activities planned to follow clearance.

    View project
  3. Pre Project Stage Cement Updated

    Rs.22750 Million Integrated Cement Plant in Khairagarh-Chhuikhadan-Gandai district, Chhattisgarh

    Chhattisgarh From 5000 Million to 49999 Million

    Notable company is setting up a new integrated cement manufacturing complex in Chhattisgarh comprising a 2.5 million TPA clinker unit and 3.5 million TPA cement grinding facility, backed by a 25 MW captive power plant, 16 MW waste heat recovery system, synthetic gypsum unit and DG sets. The Fresh ToR application is currently under examination by the Ministry of Environment, Forest and Climate Change, with land acquisition for the 65-hectare greenfield site in progress.

    View project
  4. Pre Project Stage Steel Projects Updated

    Rs.4620 Million Greenfield Integrated Steel Plant in Raipur, Chhattisgarh

    Chhattisgarh From 1000 Million to 4999 Million

    A greenfield integrated steel complex is planned near Raipur, Chhattisgarh, featuring twin 350 TPD DRI kilns, induction/reheating furnaces, a rerolling mill, a galvanizing line, a captive 35 MW power plant and a fly ash brick unit. The project is currently at the ToR (Terms of Reference) stage with the Ministry of Environment, Forest and Climate Change, with a query/clarification pending on the application. Land (9.907 Ha, non-forest, government-allotted) has already been secured from the Chhattisgarh State Industrial Development Corporation.

    View project
  5. Pre Project Stage Steel Projects Updated

    Rs.10657 Million Greenfield Integrated Steel & Power Plant in Raipur, Chhattisgarh

    Chhattisgarh From 5000 Million to 49999 Million

    A greenfield integrated steel complex is proposed in Raipur district, Chhattisgarh, comprising sponge iron, iron ore beneficiation and pelletization, rotary hearth furnace, MS billets, rolled steel, ferro alloys, GI pipe/wire, fly ash bricks and a 50 MW captive power plant. The proposal is currently under examination by the Ministry of Environment, Forest and Climate Change for grant of Terms of Reference. Total project cost is estimated at ₹10,657.7 million on 25.958 hectares of non-forest land.

    View project