New & Upcoming Projects in Chemicals Projects in India – Page 8

4,972 upcoming and ongoing chemicals projects in India worth ?23.27 lakh crore, with investment, location, project stage and latest status. Last updated 17 Oct 2026.

Projects tracked
4,972
Total investment
₹23.27 lakh crore
Projects above ₹100 Cr
947
Added in the last 30 days
53

Latest chemicals projects in India

Showing 36–40 of 4,972
  1. Environment Clearance Stage Specialty Chemicals Updated

    Metal and Ceramic Nano Powder Manufacturing Project in Yadadri-Bhuvanagiri District, Telangana

    Telangana Less than 100 Million

    A new facility is being established to manufacture stainless steel powder, metal powder (spherical and non-spherical), nano/micro oxide powder and nano/micro ceramic powder. The project involves an investment of Rs. 89.9 Million on a 3000 sq. mtr plot with 1576.94 sq. mtr built-up area. The State Pollution Control Board has granted Consent to Establish for the unit, which is at the environmental clearance stage.

    View project
  2. Pre Project Stage Other Chemicals Updated

    Rs.15000 Million Greenfield Integrated Paint and Coal Tar-Based Products Manufacturing Plant in Odisha

    Odisha From 5000 Million to 49999 Million

    A greenfield facility is proposed to manufacture solvent and water-based paints, emulsions, resins, driers, construction chemicals and coal tar-based products on about 32.4 hectares in Khordha district, Odisha. The proposal is currently under examination for Terms of Reference with the Ministry of Environment, Forest and Climate Change, with consent to establish to be sought after ToR issuance.

    View project
  3. Environment Clearance Stage Pharmaceuticals Projects Updated

    Pharmaceutical Formulation Expansion Project in Thane district, Maharashtra

    Maharashtra Less than 100 Million

    The project involves expansion of manufacturing capacity for ointments, capsules, tablets and liquid syrups at an existing pharmaceutical formulation facility. The State Pollution Control Board has granted Consent to Establish for the expansion, with a capital investment of Rs. 90 Million. The facility is located at MIDC Badlapur, Ambernath, Thane district.

    View project
  4. Pre Project Stage Pharmaceuticals Projects Updated

    Rs.203 Million Active Pharmaceutical Ingredients Mfg. Expansion Project in Gujarat

    Gujarat From 100 Million to 999 Million

    An operational specialty chemicals and API manufacturing facility in Surat SEZ, Gujarat is undergoing capacity expansion across multiple product lines. The expansion is currently under environmental examination for fresh Terms of Reference before construction activity begins. Total project cost including existing and proposed components is around Rs. 203.81 Million.

    View project
  5. Pre Project Stage Synthetic Organic Chemicals Updated

    Rs.651 Million New Formaldehyde and Resin Mfg. Unit in Ludhiana, Punjab

    Punjab From 100 Million to 999 Million

    A new chemical manufacturing unit is proposed to produce Formaldehyde (66,000 TPA) and Resin in PF/MF/Interior/Exterior grades (82,500 TPA), totaling 148,500 TPA capacity, at Industrial Focal Point Raikot in Ludhiana district, Punjab. The project has received Standard ToR clearance from the Ministry of Environment, Forest and Climate Change, with construction yet to commence

    View project