New & Upcoming Projects in Chemicals Projects in Gujarat – Page 6

1,696 upcoming and ongoing chemicals projects in Gujarat worth ?6.76 lakh crore, with investment, location, project stage and latest status. Last updated 16 Oct 2026.

Projects tracked
1,696
Total investment
₹6.76 lakh crore
Projects above ₹100 Cr
278
Added in the last 30 days
21

Latest chemicals projects in Gujarat

Showing 26–30 of 1,696
  1. Pre Project Stage Pharmaceuticals Projects Updated

    Rs.492 Million Bulk Drug and Pharmaceutical Intermediates Manufacturing Project in Gujarat

    Gujarat From 100 Million to 999 Million

    A new synthetic organic chemicals unit is proposed to manufacture bulk drugs and pharmaceutical intermediates - including antifungal, antidiabetic and antiprotozoal APIs such as Fluconazole, Voriconazole, Metronidazole, Glimepiride and Itraconazole - with a total proposed capacity of about 5136 TPA (426 MT/month plus R&D). The facility is planned on 3.75 hectares of privately-owned non-forest land near Skywin Spinning Pvt Ltd, Kuvadva-Wankaner Road, Sanosara village, Rajkot, Gujarat. The Fresh EC/ToR application is currently under verification with the Ministry of Environment, Forest and Climate Change; construction has not yet commenced.

    View project
  2. Under Implementation Synthetic Organic Chemicals Updated

    Rs.360 Million Synthetic Organic Chemicals Manufacturing Expansion Project in Gujarat

    Gujarat From 100 Million to 999 Million

    A Gujarat-based chemicals manufacturer is expanding its synthetic organic chemicals unit at Ankleshwar, raising Azo Pigment capacity from 70 to 300 MT/month at a total project cost of ₹36 crore. The Ministry of Environment, Forest and Climate Change has granted Standard Terms of Reference for the expansion, which is located within the notified Ankleshwar GIDC industrial estate.

    View project
  3. Pre Project Stage Other Chemicals Updated

    Rs.1030 Million Adhesive Manufacturing Plant Expansion Project in Bharuch, Gujarat

    Gujarat From 100 Million to 999 Million

    An existing adhesive solutions manufacturing facility at GIDC Jhagadia, Bharuch is being expanded with new polyester and polyurethane-based product lines, raising total production capacity to over 56,000 TPA across solvent-based and solvent-free adhesives, hardeners, PU adhesives and primers. The expansion is currently under verification with the Ministry of Environment, Forest and Climate Change for grant of Environmental Clearance.

    View project
  4. Pre Project Stage Other Chemicals Updated

    Synthetic Organic Chemicals Mfg. Expansion Project in Kachchh, Gujarat

    Gujarat Less than 100 Million

    An existing wood panel manufacturing unit (flush doors, block board, ply wood, ply & veneer) is expanding to add captive production of synthetic organic resins — urea formaldehyde, melamine formaldehyde, melamine urea formaldehyde and phenol formaldehyde resins — for in-house use. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change ahead of ToR/EC approval, with the resin unit to be added within the existing brownfield premises.

    View project
  5. Pre Project Stage Agrochemicals / Pesticides Updated

    Rs.1200 Million Pesticide Technical and Pesticide Intermediates Manufacturing Project in Bharuch, Gujarat

    Gujarat From 1000 Million to 4999 Million

    A new greenfield facility for manufacturing pesticide technical grade products and pesticide intermediates is proposed on a 1.75-hectare plot within the Gujarat Petrochemicals and Petrochemicals Investment Region (PCPIR) at GIDC Dahej-II. The project has a total outlay of about ₹120 crore and has received Standard ToR from the Ministry of Environment, Forest and Climate Change, with baseline environmental data collection yet to be undertaken.

    View project