Pre Project Stage Thermal Power & Grid Infrastructure Private Sector
Rs.331520 Million Mirzapur Thermal Power Plant Expansion Project in Mirzapur, Uttar Pradesh
- Investment
- More than 49999 Million
- Stage
- Pre Project Stage
- Location
- Mirzapur, Uttar Pradesh
- Last updated
- 16 Oct 2026
Project summary
A 1600 (2x800) MW Ultra Super Critical Thermal Power Project is proposed as Phase II expansion of an existing 1600 MW plant, raising total capacity to 3200 MW. The expansion will come up within the existing project area at Village Dadri Khurd, Tehsil Mirzapur Sadar, District Mirzapur, Uttar Pradesh
Project details
| Segment | Thermal Power & Grid Infrastructure |
|---|---|
| Industry | Power Generation |
| Products & capacity | Thermal Power Plant (1600 MW) |
| District | Mirzapur |
| State | Uttar Pradesh |
| Investment | More than 49999 Million |
| Project type | Expansion |
| Ownership | Private Sector |
| Stage | Pre Project Stage |
| Last updated | 16 Oct 2026 |
| Promoter / company | 🔒 Subscribers only Unlock |
| Site location & address | 🔒 Subscribers only Unlock |
| Promoter contact | 🔒 Subscribers only Unlock |
| Decision makers | 🔒 Subscribers only Unlock |
| Milestone history | 🔒 Subscribers only Unlock |
Get the full picture on this project
Unlock promoter details, exact site address, decision-maker contacts and milestone updates.