Pre Project Stage Steel Projects Private Sector
Rs.80000 Million Integrated Steel Plant and Captive Power Plant Expansion Project in Paschim Bardhaman, West Bengal
- Investment
- More than 49999 Million
- Stage
- Pre Project Stage
- Location
- Paschim Bardhaman, West Bengal
- Last updated
- 30 Jul 2026
Project summary
A large-scale expansion of an existing integrated steel plant from 1.0 MTPA to 8.0 MTPA capacity, along with enhancement of the associated captive power plant from 200 MW to 1119 MW, at Jamuria in West Bengal. The proposal has been accepted and referred to the Expert Appraisal Committee by the Ministry of Environment, Forest and Climate Change for further environmental appraisal. The project involves addition of new facilities and reconfiguration of existing EC-accorded units, with no fresh site examination required as it is a brownfield expansion.
Project details
| Segment | Steel Projects |
|---|---|
| Industry | Metallurgical Industries |
| Products & capacity | Steel Plant: (from 1.0 MTPA to 8.0 MTPA); Captive Power Plant (from 200 MW to 1119 MW) |
| District | Paschim Bardhaman |
| State | West Bengal |
| Investment | More than 49999 Million |
| Project type | Expansion |
| Ownership | Private Sector |
| Stage | Pre Project Stage |
| Last updated | 30 Jul 2026 |
| Promoter / company | 🔒 Subscribers only Unlock |
| Site location & address | 🔒 Subscribers only Unlock |
| Promoter contact | 🔒 Subscribers only Unlock |
| Decision makers | 🔒 Subscribers only Unlock |
| Milestone history | 🔒 Subscribers only Unlock |