Environment Clearance Stage Environment Private Sector
Vehicle Scrapping Facility Project in West Bengal
- Investment
- Less than 100 Million
- Stage
- Environment Clearance Stage
- Location
- South 24 Parganas, West Bengal
- Last updated
- 24 Sep 2026
Project summary
A new end-of-life vehicle (ELV) recycling and scrapping unit is being established with capacity to process 1500 vehicles per month. The facility will recover glass, rubber, plastic, ferrous and non-ferrous metal scrap, used oils and e-waste from scrapped vehicles. The project has received Consent to Establish from the State Pollution Control Board.
Project details
| Segment | Environment |
|---|---|
| Industry | Environment |
| Products & capacity | Glass Scrap - 52.5 Metric Tonnes/Month; Rubber Scrap - 205 Metric Tonnes/Month; Plastic Scrap - 234 Metric Tonnes/Month; Ferrous Metal Scrap - 2610 Metric Tonnes/Month; Aluminium Scrap - 112.5 Metric Tonnes/Month; Copper & Brass Scrap - 37.5 Metric Tonnes/Month; Used Oil, Transmission Oil, Brake Fluids & Cleaners, Used Fuel etc. - 28.5 Metric Tonnes/Month; E-wastes (Air Conditioners, Display Unit, Printed Circuit Board, Music System etc., Battery Wastes) - 15 Metric Tonnes/Month |
| District | South 24 Parganas |
| State | West Bengal |
| Investment | Less than 100 Million |
| Project type | New |
| Ownership | Private Sector |
| Stage | Environment Clearance Stage |
| Last updated | 24 Sep 2026 |
| Promoter / company | 🔒 Subscribers only Unlock |
| Site location & address | 🔒 Subscribers only Unlock |
| Promoter contact | 🔒 Subscribers only Unlock |
| Decision makers | 🔒 Subscribers only Unlock |
| Milestone history | 🔒 Subscribers only Unlock |
Get the full picture on this project
Unlock promoter details, exact site address, decision-maker contacts and milestone updates.