Pre Project Stage Thermal Power & Grid Infrastructure Projects Private Sector
Rs.560300 Million Coal Based Ultra Super-Critical Thermal Power Project in Chhattisgarh
- Investment
- More than 49999 Million
- Stage
- Pre Project Stage
- Location
- Surguja and Surajpur, Chhattisgarh
- Last updated
- 24 Sep 2026
Project summary
A greenfield 4800 MW (6x800 MW) coal-based ultra super-critical thermal power plant is proposed across Surguja and Surajpur districts of Chhattisgarh, involving total land requirement of about 673.5 hectares including forest land. The proposal, filed for Terms of Reference, is currently under examination by the Ministry of Environment, Forest and Climate Change with baseline environmental data collection yet to begin. Land has been allotted by the state industrial corporation and possession is being formalized through an intra-group MoU ahead of construction.
Project details
| Segment | Thermal Power & Grid Infrastructure Projects |
|---|---|
| Industry | Power Generation |
| Products & capacity | Coal Based Ultra Super-Critical Thermal Power (4800 MW) |
| District | Surguja and Surajpur |
| State | Chhattisgarh |
| Investment | More than 49999 Million |
| Project type | New |
| Ownership | Private Sector |
| Stage | Pre Project Stage |
| Last updated | 24 Sep 2026 |
| Promoter / company | 🔒 Subscribers only Unlock |
| Site location & address | 🔒 Subscribers only Unlock |
| Promoter contact | 🔒 Subscribers only Unlock |
| Decision makers | 🔒 Subscribers only Unlock |
| Milestone history | 🔒 Subscribers only Unlock |
Get the full picture on this project
Unlock promoter details, exact site address, decision-maker contacts and milestone updates.