Projects in Tamil Nadu

1,694 upcoming and ongoing projects in Tamil Nadu worth ₹2,472,068 Cr, with investment, location, project stage and latest status. Last updated 09 Oct 2026.

Projects tracked
1,694
Total investment
₹2,472,068 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
9

Latest projects in Tamil Nadu

Showing 1–5 of 1,694
  1. Pre Project Stage Steel Updated

    Rs.8898 Million Brownfield Expansion of Cold Rolled Steel Strip in Thiruvallur, Tamil Nadu

    Tamil Nadu From 5000 Million to 49999 Million

    An existing steel-processing facility at Avadi, Thiruvallur (Tamil Nadu), operational since 1950, is undergoing expansion of its Cold Rolled Annealed Steel Strip, Electrically Resistant Welded (ERW) and Cold Drawn Welded Steel Tube manufacturing lines, raising total capacity from about 0.1602 MTPA to 0.336 MTPA. The Rs. 8898.65 Million project is being carried out entirely within the existing 34.583 hectare industrial premises, with no additional land required.

    View project
  2. Bidding Stage Renewable Power Updated

    Rs. 770 Million Offshore Wind Prototype Project in Thoothukudi coast, Tamil Nadu

    Tamil Nadu From 100 Million to 999 Million

    India's first offshore wind farm prototype is being tendered off the coast of Thoothukudi, Tamil Nadu, featuring a single 6.25 MW turbine located about 1,650 meters from the Southern Breakwater of the Inner Harbour. The project will cover design, procurement, construction, installation, testing and commissioning, followed by two years of operation and maintenance.

    View project
  3. Announcement Stage Vehicle Assembly Updated

    Rs.40000 Million Vehicle Assembly Unit Expansion Project in Kanchipuram, Tamil Nadu

    Tamil Nadu From 100 Million to 999 Million

    A prominent automotive manufacturer is executing a Rs. 688.8 million assembly line expansion at its industrial facility in Oragadam, Kanchipuram, Tamil Nadu. The development adds 17,491 square meters of new operational space to an existing 4,55,470.55 square meter manufacturing footprint. Construction begins in July 2026, with state environmental clearance pending.

    View project
  4. Pre Project Stage Hospitals / Healthcare Updated

    Rs.500 Million Hospital Building Construction Project in Tiruchirappalli, Tamil Nadu

    Tamil Nadu From 100 Million to 999 Million

    A 100-bedded hospital building comprising two basements, ground floor, four upper floors and a head room, with a total built-up area of about 24,036 sq.m, is proposed to be constructed at Chinthamani village near Tiruchirappalli. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change for fresh Environmental Clearance under Category B2.

    View project
  5. Announcement Stage Ports / Shipping Updated

    Rs.171670 Million New Outer Harbour Project in Tuticorin, Tamil Nadu

    Tamil Nadu More than 49999 Million

    The Cabinet Committee on Economic Affairs has approved a new Outer Harbor Project at a major port in Thoothukudi, comprising harbor infrastructure and container terminal expansion. The project includes breakwaters, rock bunds, wharfs, backup yard infrastructure, and two container terminals with 1,000 meter quay length each, capable of handling 4 to 5.2 Million TEUs. The project is currently at the approval stage with implementation to follow under Hybrid Annuity and DBFOT models.

    View project