Renewable Power Projects in Madhya Pradesh

61 upcoming and ongoing renewable power projects in Madhya Pradesh worth ₹104,355 Cr, with investment, location, project stage and latest status. Last updated 30 Sep 2026.

Projects tracked
61
Total investment
₹104,355 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
3

Latest renewable power projects in Madhya Pradesh

Showing 1–5 of 61
  1. Announcement Stage Renewable Power Projects Updated

    New Wind Power Project in Madhya Pradesh

    Madhya Pradesh NA

    A 49.5 MW wind power project is being set up in Madhya Pradesh under the group captive power model. The project will supply renewable electricity to a cement manufacturer's operations in the state for 25 years. Commercial operation is targeted for January 2028.

    View project
  2. Pre Project Stage Renewable Power Projects Updated

    Rs.75269 Million Shivni Pump Storage Project in Barwani district, Madhya Pradesh.

    Madhya Pradesh More than 49999 Million

    A new 1500 MW off-stream, closed-loop pumped storage hydro power project is proposed with two newly constructed reservoirs. The project is under environmental review, having been accepted and referred to the Expert Appraisal Committee for Terms of Reference. Land acquisition (291 ha, including 255 ha forest land) and rehabilitation & resettlement are yet to begin.

    View project
  3. Announcement Stage Renewable Power Projects Updated

    Limbawas Wind Energy Project in Madhya Pradesh

    Madhya Pradesh NA

    First wind energy project in Madhya Pradesh, with a capacity of 200 MW at Limbawas. Suzlon will supply 64 of its flagship S144 (3.15 MW) wind turbine generators and execute the project on an end-to-end EPC basis, covering land acquisition, balance of plant, pooling substation, EHV line, commissioning and O&M. The power generated will be connected to the MPPCL state grid; the order was announced in September 2026.

    View project
  4. Pre Project Stage Renewable Power Projects Updated

    Rs.3500 Million New TopCon Solar Cell Mfg. Project in Ratlam, Madhya Pradesh

    Madhya Pradesh From 1000 Million to 4999 Million

    A domestic solar energy solutions provider is setting up a Rs. 3,500 million, 1.2 GW TopCon solar cell manufacturing facility in Ratlam, Madhya Pradesh. The backward-integration plant expands the developer's multi-gigawatt footprint and will yield high-efficiency DCR-compliant technology. Having received formal state pollution board approvals, construction is aligning toward a commercial launch by Q1 FY2028.

    View project
  5. Under Implementation Renewable Power Projects Updated

    New Renewable Energy Component Mfg. Unit in Neemuch, Madhya Pradesh

    Madhya Pradesh Less than 100 Million

    A new renewable energy component manufacturing unit is planned for Neemuch, Madhya Pradesh, focusing on ultra-clear patterned solar glass. The facility will feature a 1,200 TPD capacity developed in two phases. Currently awaiting environmental clearance as of May 2026, the ₹700 million project is scheduled for construction between July 2026 and June 2027.

    View project