  1. Environment Clearance Stage Pharmaceuticals Projects Updated

    Rs.183 Million New Pharmaceutical Products Mfg. Project in Solan, Himachal Pradesh

    Himachal Pradesh From 100 Million to 999 Million

    A new large-scale pharmaceutical formulation unit is being set up at EPIP Phase-1, Jharmajri, Baddi, producing pre-filled syringes, liquid injections and ampoules for sustained/extended release drugs. The unit has secured Consent to Establish from the State Pollution Control Board under Water and Air Acts. The facility is intended for both commercial sale and life-saving injectable products, with R&D-linked formulation capability.

    View project
  2. Environment Clearance Stage Pharmaceuticals Projects Updated

    Pharmaceutical Formulation Expansion Project in Thane district, Maharashtra

    Maharashtra Less than 100 Million

    The project involves expansion of manufacturing capacity for ointments, capsules, tablets and liquid syrups at an existing pharmaceutical formulation facility. The State Pollution Control Board has granted Consent to Establish for the expansion, with a capital investment of Rs. 90 Million. The facility is located at MIDC Badlapur, Ambernath, Thane district.

    View project
  3. Pre Project Stage Pharmaceuticals Projects Updated

    Rs.203 Million Active Pharmaceutical Ingredients Mfg. Expansion Project in Gujarat

    Gujarat From 100 Million to 999 Million

    An operational specialty chemicals and API manufacturing facility in Surat SEZ, Gujarat is undergoing capacity expansion across multiple product lines. The expansion is currently under environmental examination for fresh Terms of Reference before construction activity begins. Total project cost including existing and proposed components is around Rs. 203.81 Million.

    View project
  4. Pre Project Stage Pharmaceuticals Projects Updated

    Rs.454 Million Pharmaceutical API and Intermediates Manufacturing Expansion Project in Gujarat

    Gujarat From 100 Million to 999 Million

    An existing pharmaceutical intermediates and API manufacturing facility within the Sarabhai Petrochemical Complex at Ranoli, Vadodara is undertaking an expansion to add several new products including anticoagulants, local anaesthetics, and antifungal APIs, alongside an increase in overall production capacity. The proposal is currently under examination by the Ministry of Environment, Forest and Climate Change for grant of Terms of Reference under EIA Category A. Physical expansion work is expected to commence once environmental clearance formalities are completed.

    View project
  5. Under Implementation Pharmaceuticals Projects Updated

    Rs. 3500 Million backward-integrated expansion of Ibuprofen manufacturing capacity at Barnala, Punjab

    Punjab From 5000 Million to 49999 Million

    A major chemicals and API manufacturing project is planned in Badbar, Barnala, Punjab, with a capacity of 470,326.5 TPA. The project includes a 33 MW co-generation plant and formulation units. Estimated at around ₹14,000–18,500 million, construction is set for September 2025–October 2027. Environmental clearance and land possession have been secured.