Other Manufacturing Projects in Andhra Pradesh – Page 8

142 upcoming and ongoing other manufacturing projects in Andhra Pradesh worth ₹23,295 Cr, with investment, location, project stage and latest status. Last updated 09 Oct 2026.

Projects tracked
142
Total investment
₹23,295 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
3

Latest other manufacturing projects in Andhra Pradesh

Showing 36–40 of 142
  1. Project Work Commenced Other Manufacturing Updated

    New Diesel Generator Sets Assembling Unit in Krishna, Andhra Pradesh

    Andhra Pradesh Less than 100 Million

    A new diesel generator sets assembling unit is planned in APIIC Model Industrial Park, Mallavalli, Bapulapadu, Krishna, Andhra Pradesh. The facility will have a production capacity of 480 units per annum and is estimated to cost ₹32.2 million. As of July 2025, the project has received consent to establish from the state pollution control authorities and is set to proceed.

    View project
  2. Project Work Commenced Other Manufacturing Updated

    Rs.657 Million New Sheet Metal White Goods Mfg. Project in Tirupati, Andhra Pradesh

    Andhra Pradesh From 100 Million to 999 Million

    A new sheet metal white goods manufacturing project is planned in Sri City, Cherivi Village, Satyavedu Mandal, Tirupati, Andhra Pradesh. The facility will produce 2,520 metric tonnes annually and is estimated to cost Rs. 657.2 million. As of May 2025, the project has received approval from the state pollution control authorities for establishment.

    View project
  3. Project Work Commenced Other Manufacturing Updated

    Rs.2000 Million New LED TV Plastic Components Mfg. Project in Tirupati, Andhra Pradesh

    Andhra Pradesh From 100 Million to 999 Million

    A new project for manufacturing LED TV plastic components with a capacity of 84,000 Nos. per month is planned at a cost of Rs.136.5 million in Govindavaram Village, Tirupati, Andhra Pradesh. As of February 2023, the company has received the necessary approvals from state pollution control authorities to establish the project.

    View project
  4. Project Work Commenced Other Manufacturing Updated

    Rs.250 Million New Autoclaved Aerated Concrete Blocks Mfg. Project in Tirupati, Andhra Pradesh

    Andhra Pradesh NA

    A new Autoclaved Aerated Concrete Blocks manufacturing project is planned in Industrial Park Mambattu, Tirupati, Andhra Pradesh, with an annual capacity of 72,500 MT. The project is estimated to cost Rs.250 million. As of May 2025, consent from the state pollution control authorities has been obtained to proceed with establishing the facility.

    View project
  5. Project Work Commenced Other Manufacturing Updated

    New Transformers and Testing Center Mfg. Project in YSR District, Andhra Pradesh

    Andhra Pradesh Less than 100 Million

    A new Transformers Manufacturing and Testing Center is set to be established in IDA Kadapa, YSR District, Andhra Pradesh, with a capacity of 200,000 units annually. The ₹60 million project aims to enhance power infrastructure. As of March 2025, it has received environmental clearance, paving the way for implementation.

    View project