Non-Ferrous Metals Projects in India – Page 56

742 upcoming and ongoing non-ferrous metals projects in India worth ₹871,385 Cr, with investment, location, project stage and latest status. Last updated 18 Sep 2026.

Projects tracked
742
Total investment
₹871,385 Cr
Projects above ₹100 Cr
224
Added in the last 30 days
1

Latest non-ferrous metals projects in India

Showing 276–280 of 742
  1. Project Work Commenced Non-Ferrous Metals Projects Updated

    New Plastic Chips & Graunels Mfg. Project in Samba, Jammu & Kashmir

    Jammu and Kashmir Less than 100 Million

    A new plastic chips and granules manufacturing project is planned in Jammu & Kashmir's SIDCO Industrial Complex, featuring various production lines including antimonial lead and lead acid battery. With an estimated cost of Rs.79.444 million, the project received approval from state pollution control authorities as of May 2024.

    View project
  2. Project Work Commenced Non-Ferrous Metals Projects Updated

    New South Kaliapani Chromite Mines Project in Jaipur, Odisha

    Odisha NA

    A chromite mines project is planned in Villages Kalipani, Gurujangpal, Sukurangi, and Saruabil, Odisha. It includes mining chrome ore at 1.40 MTPA and expanding the COB plant to 0.47 MTPA, with a lease area increase from 552.457 Ha to 720.727 Ha. Additionally, a 1250 TPH crushing and screening plant and a new DG set of 11500 KVA capacity will be installed. Consent from state pollution control authorities was obtained as of May 2024.

    View project
  3. Project Work Commenced Non-Ferrous Metals Projects Updated

    New Barbed Wire of Iron Steel Mfg. Project in Durg, Chhattisgarh

    Chhattisgarh NA

    A new manufacturing project in Heavy Industrial Area, Bhilai, Chhattisgarh, involves producing barbed wire of iron steel at a capacity of 2000 MTPA, wire ropes galvanized iron and steel with gasifier at 14,000 MTPA, and M S wire at 7500 MTPA. As of May 2024, the project has secured consent from state pollution control authorities.

    View project
  4. Project Work Commenced Non-Ferrous Metals Projects Updated

    New Insulated Copper Wire Mfg. Project in Howrah, West Bengal

    West Bengal Less than 100 Million

    A new manufacturing project for insulated copper wire is planned in West Bengal. Located in Jalan Industrial Complex, the project aims to produce various wire types and steel lamination punching. With monthly targets set for copper and aluminum winding, it's estimated to cost Rs.67.761 million. State pollution control authorities have granted approval for the project as of May 2024.

    View project