New & Upcoming Projects in Metallurgical Industries Projects in West Bengal – Page 10

271 upcoming and ongoing metallurgical industries projects in West Bengal worth ?2.99 lakh crore, with investment, location, project stage and latest status. Last updated 17 Sep 2026.

Projects tracked
271
Total investment
₹2.99 lakh crore
Projects above ₹100 Cr
133
Added in the last 30 days
1

Latest metallurgical industries projects in West Bengal

Showing 46–50 of 271
  1. Under Implementation Steel Projects Updated

    Rs.16520 Million Steel Plant Expansion Project in Purulia, West Bengal

    West Bengal From 5000 Million to 49999 Million

    A large-scale expansion of an existing steel plant is proposed in Purulia, West Bengal. The project includes installation of multiple steelmaking, rolling, sintering, power generation, and auxiliary units to significantly enhance capacity. With an investment of Rs. 16,520 million, construction is planned from February 2026 to January 2029 and is under state-level environmental clearance review.

    View project
  2. Project Work Commenced Steel Projects Updated

    Rs.215 Million New DI Castings Unit in Paschim Bardhaman, West Bengal

    West Bengal From 100 Million to 999 Million

    A new ductile iron castings manufacturing unit is proposed at Bamunara Industrial Area, Kanksa, Paschim Bardhaman, West Bengal. The project will have a production capacity of 900 metric tonnes per month. Estimated at Rs. 215.8 million, the project has received consent from the state pollution control authorities as of January 2026.

    View project
  3. Project Work Commenced Steel Projects Updated

    Rs.4787 Million New Cold Rolled Bright Annealed Slitted Coil Mfg. Project in Paschim Medinipur, West Bengal

    West Bengal From 1000 Million to 4999 Million

    A new cold rolled bright annealed slitted coil manufacturing project is proposed at Vidyasagar Industrial Park, Jakpur, Kharagpur, Paschim Medinipur, West Bengal. The unit will have a production capacity of 20,000 metric tonnes per month. The project is estimated to cost Rs. 4,787.8 million. As of January 2026, consent to establish has been received from the state pollution control authorities.

    View project
  4. Under Implementation Steel Projects Updated

    Rs.300 Million Expansion Hot & Cold Rolling Mill Project in Paschim Bardhaman, West Bengal

    West Bengal From 100 Million to 999 Million

    An existing metallurgical facility is planning an expansion by installing hot and cold rolling mills. The project aims to utilize liquid metal and cast products from existing induction furnaces, submerged arc furnaces, and continuous casting machines for downstream rolling operations, enhancing production efficiency and maximizing use of internally generated materials.

    View project
  5. Under Implementation Steel Projects Updated

    Rs.1500 Million Sponge Iron Expansion Project in Paschim Bardhaman, West Bengal

    West Bengal From 1000 Million to 4999 Million

    An expansion project is underway at Mangalpur Industrial Estate, West Bengal, to significantly enhance iron and steel manufacturing capacity. The plan includes doubling sponge iron output, adding DRI kilns, expanding captive power through WHRB, and increasing ferro alloy production capacities. The project, under environmental clearance review, involves phased construction through November 2026.

    View project