M.S. Pipe Mfg. Project in Raipur, Chhattisgarh
A new M.S. Pipe manufacturing project is planned in Industrial Area Siltara, Phase-II, Raipur, Chhattisgarh. It includes the production of M.S. Pipes (60,000 M.T./Year), Tube or Pipe Fittings (30,000 M.T./Year), Re-Rolled Products (59,900 M.T./Year), and Scrap Packaging (40,000 M.T./Year). With an estimated investment of ₹<cost> million, the project has received environmental clearance as of March 2025.
View project