  1. Pre Project Stage Other Manufacturing Updated

    New OEM Mfg. Facility in Hosur, Tamil Nadu

    Tamil Nadu Less than 100 Million

    A manufacturing expansion adding 24,000 sq. ft. is underway in Hosur, Tamil Nadu. Budgeted at Rs. 60 million, the project will double CNC cutting capacity with new machinery and boost conveyor belt output. Pre-project activities are actively progressing as of July 2026.

    View project
  2. Pre Project Stage Other Manufacturing Updated

    Rs.40000 Million New Integrated Rare Earth Mining and Processing Facility in Tuticorin, Tamil Nadu

    Tamil Nadu From 5000 Million to 49999 Million

    An integrated rare earth mining and processing facility is being developed in Tuticorin, Tamil Nadu, at an estimated cost of Rs. 40,000 million. Designed to produce rare earth oxides for permanent magnets used in EVs, wind energy, and defense, the project reached active pre-project development stages as of July 2026.

    View project
  3. Under Implementation Packaging / Plastics Updated

    Plastics Products Mfg. Unit Expansion Project in Krishnagiri, Tamil Nadu

    Tamil Nadu Less than 100 Million

    A plastics manufacturing expansion project covering 31,319.97 sq. meters is planned in Hosur, Tamil Nadu. Costing Rs. 70.3 million, the facility will produce 1,000 Tonnes/month of injection & blow moulding components along with tools, jigs, and fixtures. Pending environmental clearance since July 2026, construction is scheduled from September 2026 to September 2027.

    View project
  4. Pre Project Stage Other Manufacturing Updated

    Rs.12500 Million Neodymium Iron Boron (NdFeB) Rare Earth Magnet Mfg. Facility in Andhra Pradesh

    Andhra Pradesh From 5000 Million to 49999 Million

    India's first fully integrated Neodymium-Iron-Boron (NdFeB) rare earth magnet manufacturing facility is being developed at Naidupeta Industrial Park, Andhra Pradesh. Built with an initial Phase I outlay of ₹12,500 million, the plant starts with a 1,200 TPA capacity, expandable to 10,000 TPA. Land has been secured, with commercial production scheduled for Q1 2028.

    View project
  5. Pre Project Stage Electronics, Semiconductors & Data Centers Updated

    Rs.62000 Million New Advanced Semiconductor Packaging Facility in Madhya Pradesh

    Madhya Pradesh From 5000 Million to 49999 Million

    A greenfield Outsourced Semiconductor Assembly and Test (OSAT) packaging facility is planned in the Indore-Ujjain region of Madhya Pradesh with an investment of ₹62,000 million. Featuring 2.5D/3D packaging, chiplet integration, and wafer bumping, the project secured a Memorandum of Understanding with the MP State Electronics Development Corporation in July 2026, creating over 2,500 direct jobs.