New & Upcoming Projects in Manufacturing Projects in India – Page 17

3,591 upcoming and ongoing manufacturing projects in India worth ?29.58 lakh crore, with investment, location, project stage and latest status. Last updated 15 Oct 2026.

Projects tracked
3,591
Total investment
₹29.58 lakh crore
Projects above ₹100 Cr
813
Added in the last 30 days
42

Latest manufacturing projects in India

Showing 81–85 of 3,591
  1. Pre Project Stage Paper Products Updated

    Rs.1545 Million Duplex Board Manufacturing Unit Expansion Project in Surat, Gujarat

    Gujarat From 1000 Million to 4999 Million

    A duplex board paper manufacturing unit in Surat district, Gujarat is expanding its captive power generation capacity from 4.8 MW to 6.5 MW and adding a deinking process to its existing paperboard line. The proposal, filed as a Fresh ToR application with the Ministry of Environment, Forest and Climate Change, is currently under examination. The existing unit has been operational since 2013, with the expansion expected to add processing capacity and employment once cleared.

    View project
  2. Environment Clearance Stage Packaging / Plastics Updated

    Rs.223 Million Plastic Packaging Drums and HDPE Pipe Manufacturing Expansion Project in Howrah district, West Bengal

    West Bengal From 100 Million to 999 Million

    An existing plastic products manufacturing unit is expanding capacity to produce bulk and medium packaging drums along with HDPE pipes. The State Pollution Control Board has granted Consent to Establish for the expansion. The facility is located at Mouza Islampur, Banharishpur, in Howrah district, West Bengal.

    View project
  3. Environment Clearance Stage Other Manufacturing Updated

    Rs.233 Million Bellows and Secondary Fluid Network Mfg. Project in Pune, Maharashtra

    Maharashtra From 100 Million to 999 Million

    A company has secured Consent to Establish from the State Pollution Control Board for a metal bellows and secondary fluid network manufacturing facility at Shinde Village, Pune district. The unit will have capacity to produce 5,000 numbers/month of bellows and 2,000 numbers/month of secondary fluid networks, with a capital investment of about ₹23.3 crore. The consent is valid up to commissioning of the unit or five years, whichever is earlier.

    View project
  4. Environment Clearance Stage Other Manufacturing Updated

    Rs.821 Million Structural and Insulation Components Manufacturing Project in Pune, Maharashtra

    Maharashtra From 100 Million to 999 Million

    The State Pollution Control Board has granted Consent to Establish under the Orange/LSI category for a manufacturing facility producing structural reinforcements, rubber assemblies, tapes, thermal insulation and adhesive products. The project entails a capital investment of Rs. 82.1 crore at Tal Khed, Dist Pune. The consent remains valid until commissioning of the unit or up to five years, whichever is earlier.

    View project
  5. Pre Project Stage Other Manufacturing Updated

    Rs.10206 Million New Backward-Integrated Facility in Rajkot, Gujarat

    Gujarat From 5000 Million to 49999 Million

    A new backward-integrated manufacturing unit is being established in Rajkot, Gujarat, to produce electronic devices for CNC machines alongside expanding overall capacity. Estimated at an investment of ₹10,206.5 million over five years, the project secured central government investment approval under the Electronic Components Manufacturing Scheme (ECMS) in August 2026, unlocking up to 25% capital incentives.

    View project