  1. Pre Project Stage Electronics, Semiconductors & Data Centers Updated

    Rs.3000 Million New Printed Circuit Board Assemblies and Box Mfg. Unit in Khordha, Odisha

    Odisha From 1000 Million to 4999 Million

    A new electronics manufacturing facility estimated at ₹3,000 million is planned for Khordha, Odisha, dedicated to producing printed circuit board assemblies and box-build products. Approved by the State Level Single Window Clearance Authority in August 2026, the project will generate 500 jobs and expand the state's Electronics System Design and Manufacturing capabilities.

    View project
  2. Announcement Stage Electronics, Semiconductors & Data Centers Updated

    Rs.313870 Million Green AI Data Centre Project in Visakhapatnam, Andhra Pradesh

    Andhra Pradesh More than 49999 Million

    A 512-MW green integrated AI data centre has been approved for development at Amanam village in Bheemunipatnam mandal, Visakhapatnam. The Andhra Pradesh government has granted state approval with a completion timeline of two years and four months from sanction. The facility is expected to generate up to 1,000 jobs and will receive fiscal and non-fiscal state incentives including tax exemptions and power/water infrastructure support.

    View project
  3. Pre Project Stage Electronics, Semiconductors & Data Centers Updated

    Rs.11000 Million Hyderabad Green Pharma City Data Center Building Project in Ranga Reddy, Telangana

    Telangana From 5000 Million to 49999 Million

    A large-format data center building spread over 1,74,635 sq.m of built-up area on a 3.05-hectare plot at Hyderabad Green Pharma City. The facility, structured as 1 Basement + Ground + 8 Upper Floors with terrace, super terrace and a dedicated chiller platform, is currently under review by MoEFCC as a fresh Terms of Reference application. The project is expected to generate around 50 construction-phase jobs and 35 permanent operational jobs once commissioned.

    View project
  4. Environment Clearance Stage Packaging / Plastics Updated

    Rs.136 Million PP Laminated Woven Sacks/Bags Expansion Project in Bankura, West Bengal.

    West Bengal From 100 Million to 999 Million

    An expansion unit for manufacturing PP laminated woven sacks, bags and fabric is being established at the WBIDC Plasto Steel Park in Bankura district. The project has secured Consent to Establish from the State Pollution Control Board with a proposed production capacity of 250 Metric Tonnes/Month. The facility is at an environmental clearance stage of development.

    View project
  5. Project Work Commenced Electronics, Semiconductors & Data Centers Updated

    Rs.57830 Million Data Centre Expansion Project in Thane, Maharashtra

    Maharashtra From 5000 Million to 49999 Million

    A large-scale data centre expansion is planned at TTC MIDC, Koparkhairane, Thane, involving an additional 45,250 sqm of built-up area over 1.4 Ha of land, taking total built-up area to about 1,88,793 sqm. The project has received Standard ToR from the Ministry of Environment, Forest and Climate Change and is at the pre-construction environmental clearance stage, with over 5,700 crore in combined existing and proposed investment