New & Upcoming Projects in Manufacturing Projects in Telangana – Page 3

368 upcoming and ongoing manufacturing projects in Telangana worth ?2.63 lakh crore, with investment, location, project stage and latest status. Last updated 13 Oct 2026.

Projects tracked
368
Total investment
₹2.63 lakh crore
Projects above ₹100 Cr
76
Added in the last 30 days
7

Latest manufacturing projects in Telangana

Showing 11–15 of 368
  1. Environment Clearance Stage Packaging / Plastics Updated

    HDPE Bottles, PP Bottles and Flip-Off Seals Manufacturing Project in Medak district, Telangana

    Telangana Less than 100 Million

    A company establishing a new plastic packaging manufacturing facility at Automotive Park, Toopran, Muppireddipally Village, Manoharabad Mandal, Medak District, Telangana, with an investment of Rs. 71.2 Million. The unit will produce HDPE bottles, PP bottles and flip-off seals using virgin granules only. The State Pollution Control Board has granted Consent to Establish for the project, which is currently at the environmental clearance stage.

    View project
  2. Pre Project Stage Electronics, Semiconductors & Data Centers Updated

    Rs.63300 Million Hyper-Scale Data Center Project in Rangareddy district, Telangana

    Telangana More than 49999 Million

    A hyper-scale data center is proposed to be developed on a 15.10-hectare (about 37.3-acre) site at IP Chandanvelly in Shabad Mandal, Rangareddy district, Telangana, with a total built-up area of about 1,37,887.54 sq. m and a planned IT load capacity of 140 MW against a total power requirement of 224 MW.

    View project
  3. Pre Project Stage Electronics, Semiconductors & Data Centers Updated

    Rs.11000 Million Hyderabad Green Pharma City Data Center Building Project in Ranga Reddy, Telangana

    Telangana From 5000 Million to 49999 Million

    A large-format data center building spread over 1,74,635 sq.m of built-up area on a 3.05-hectare plot at Hyderabad Green Pharma City. The facility, structured as 1 Basement + Ground + 8 Upper Floors with terrace, super terrace and a dedicated chiller platform, is currently under review by MoEFCC as a fresh Terms of Reference application. The project is expected to generate around 50 construction-phase jobs and 35 permanent operational jobs once commissioned.

    View project
  4. Environment Clearance Stage Other Manufacturing Updated

    New unit for manufacture of metal doors and windows to come up at Suraram village, Medchal–Malkajgiri district, Telangana.

    Telangana NA

    A new manufacturing facility for metal doors and windows is being set up at Vishwakarma Colony, Suraram village in Medchal–Malkajgiri district. The unit has applied for Consent to Establish under the Green category, though it was found during inspection to also house a Powder Coating section falling under the Orange category, requiring additional pollution control compliance. The Consent to Establish is pending issuance upon payment of balance fee and compliance with pollution control requirements.

    View project
  5. Environment Clearance Stage Other Manufacturing Updated

    Rs.440 Million New Filters and Accumulators Mfg. Project in Sangareddy, Telangana

    Telangana From 100 Million to 999 Million

    This project involves expanding an existing filters and accumulators manufacturing unit, along with associated spray painting facilities, in Jinnaram Mandal, Sangareddy District. The expansion will double installed capacity from 1,00,000 units/annum to 2,00,000 units/annum. The State Pollution Control Board has granted Consent to Establish (Expansion) under the Water and Air Acts for the project.

    View project