Projects in Gujarat – Page 30

3,185 upcoming and ongoing projects in Gujarat worth ₹3,665,554 Cr, with investment, location, project stage and latest status. Last updated 07 Oct 2026.

Projects tracked
3,185
Total investment
₹3,665,554 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
24

Latest projects in Gujarat

Showing 146–150 of 3,185
  1. Pre Project Stage Electronics, Semiconductors & Data Centers Updated

    New Semiconductor Fabrication Unit in Gujarat

    Gujarat NA

    A major semiconductor facility is coming to Dholera, Gujarat, following Union Cabinet approval in May 2026. The integrated unit focuses on compound semiconductor fabrication and ATMP for Mini/Micro-LED modules. Utilizing GaN technology, it will produce 72,000 sq. meters of display panels annually, strengthening India’s domestic chip ecosystem and high-tech manufacturing self-reliance.

    View project
  2. Announcement Stage Renewable Power Projects Updated

    Rs.40000 Million New Solar Cell and BESS Mfg. Project in Gujarat

    Gujarat From 5000 Million to 49999 Million

    An integrated renewable energy hub is being established in Gujarat with a ₹40,000 million investment. The project includes a 5 GW solar cell facility (implemented in two phases) and a 10 GW BESS plant. Aimed at boosting domestic manufacturing and grid stability, this ecosystem will significantly enhance India’s clean energy infrastructure and industrial growth through large-scale technological integration.

    View project
  3. Under Implementation Electronics, Semiconductors & Data Centers Updated

    Rs.8493 Million New Outsourced Semiconductor Assembly and Testing (OSAT) Plant in Gujarat

    Gujarat From 5000 Million to 49999 Million

    A new Outsourced Semiconductor Assembly and Testing (OSAT) plant is being set up in Surat, Gujarat, with a daily production capacity of 300,000 chips. Estimated at Rs. 8493.95 million, the project aims to enhance semiconductor capabilities. As of December 2024, the project is in the implementation stage, focusing on advanced technology for efficient chip assembly and testing.

    View project
  4. Under Implementation Oil & Gas / Refinery Updated

    Rs.330 Million New Gas Compressor Plant in Gandhinagar, Gujarat

    Gujarat From 100 Million to 999 Million

    A new gas compression facility is being established in Gandhinagar, Gujarat, with a processing capacity of 200,000 SCMD. The Rs. 330 million project aims to enhance natural gas recovery and pressure management. Currently awaiting environmental clearance as of April 2026, the plant is slated for a rapid construction phase between August and September 2026.

    View project
  5. Under Implementation Pharmaceuticals Projects Updated

    Rs.105 Million New Active Pharmaceutical Ingredient Mfg. Unit in Ahmadabad, Gujarat

    Gujarat From 100 Million to 999 Million

    A new pharmaceutical facility is being developed in Sanand, Ahmedabad, focusing on Active Pharmaceutical Ingredient (API) production with a 283.2 TPA capacity. The ₹105 million project is currently in the environmental clearance stage. Construction is scheduled to begin in January 2027 and conclude by April 2028, aiming to strengthen the regional bulk drug manufacturing ecosystem.

    View project