Fertilizers Projects in India – Page 44

223 upcoming and ongoing fertilizers projects in India worth ₹212,325 Cr, with investment, location, project stage and latest status. Last updated 08 Sep 2026.

Projects tracked
223
Total investment
₹212,325 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
0

Latest fertilizers projects in India

Showing 216–220 of 223
  1. Pre Project Stage Fertilizers Updated

    Rs 3500 Million New Di-Nitrogen Tetroxide Mfg. Project in Madhya Pradesh

    Madhya Pradesh From 1000 Million to 4999 Million

    Leading chemical manufacturing company is planning to set up a new factory in Madhya Pradesh to produce di-nitrogen tetroxide, NFL has bagged an order from ISRO to supply di-nitrogen tetroxide (N2o4) so the company would set up a plant at Vijaipur in MP with an investment of Rs 350 crore. The annual capacity of this plant would be 1,000 tonnes

    View project
  2. Pre Project Stage Fertilizers Updated

    Rs.13000 Million New Urea Plant in Kochi, Kerala

    Kerala From 5000 Million to 49999 Million

    A new 5.0 lakh TPA urea plant using LNG as feedstock is planned to be set up at a Kochi complex in Kerala, as part of the state government's revival package. The project, estimated to cost Rs.13,000 million, is still in the conceptual stage as of February 2018. A previously operational urea plant based on naphtha had been shut down in 2002 due to economic inviability.

    View project
  3. Environment Clearance Stage Fertilizers Updated

    Rs.2623 Million Installation of GTG cum HRSG Project in Panipat, Haryana

    Haryana From 1000 Million to 4999 Million

    The central government is planning to take up an installation of GTG cum HRSG Project in Panipat NFL Unit, Panipat, Haryana. The project involves installation of GTG cum HRSG under Energy Reduction Scheme and installation of Natural draft Urea Prilling Tower at Panipat Unit.

    View project
  4. Environment Clearance Stage Fertilizers Updated

    Rs.2623 Million Installation of GTG cum HRSG Project in Bathinda, Punjab

    Punjab From 1000 Million to 4999 Million

    A GTG cum HRSG Project in Bathinda, Punjab will replace STGs with GTGs to generate 20 MW electric power and install HRSG for 70 MTPH H.P. steam. The project also includes a Natural draft Urea Prilling Tower with 1800 MTPD capacity. The project costs Rs.2623.4 million and is awaiting environmental clearance as of January 2018.

    View project