  1. Under Implementation Steel Projects Updated

    Rs.2366 Million DRI based Steel Plant Expansion Project in Raigarh, Chhattisgarh

    Chhattisgarh From 1000 Million to 4999 Million

    An expansion project in Natwarpur, Raigarh, Chhattisgarh, will increase production capacity at a DRI-based steel plant. Output of sponge iron, mild steel billets, and rolled steel products will rise significantly, along with captive power capacity and fly ash brick production. Estimated at ₹2,366.9 million, construction will begin in June 2025 and end in December 2026, with environmental clearance under review.

    View project
  2. Project Work Commenced Steel Projects Updated

    New Cold Rolled Products Mfg. Project in Raipur, Chhattishgarh

    Chhattisgarh NA

    A new Cold Rolled Products manufacturing project is planned in Raipur, Chhattisgarh, featuring facilities for Annealing, Pickling, Continuous Galvanizing, and Cold Rolled Products, each with a 58,000 metric tonnes per year capacity. The project aims to produce galvanized strips, sheets, and HRAP products. As of September 2024, the company has secured approval from state pollution control authorities.

    View project
  3. Project Work Commenced Renewable Power Projects Updated

    Biomass Based Power Plant Expansion Project in Raipur, Chhattisgarh

    Chhattisgarh NA

    A biomass-based power plant expansion project is planned in Munrethi, near Phase-II, Siltara Industrial Area, Raipur, Chhattisgarh. The project aims to develop a 10 MW facility using renewable biomass resources. As of June 2025, necessary approvals have been obtained from the state pollution control authorities to proceed with the establishment of the plant.

    View project
  4. Under Implementation Ferro Alloys Updated

    Rs.3532 Million Ferro Alloy Mfg. Expansion Project in Raipur, Chhattisgarh

    Chhattisgarh From 1000 Million to 4999 Million

    ChatGPT said: A ferro alloy manufacturing expansion project is planned in Mandir Hasaud, Raipur, Chhattisgarh, aiming to increase production capacity from 44,000 TPA to 52,000 TPA. With an estimated investment of ₹3,532.3 million, the proposal was submitted in June 2025 to the Ministry of Environment, Forest and Climate Change and is currently under review for environmental clearance.

    View project
  5. Project Work Commenced Defence / Aerospace Updated

    New Bullet Proof Vest Mfg. Project in Durg, Chhattisgarh

    Chhattisgarh NA

    new defense manufacturing project is planned in Birebhat, Dhamdha, Durg, Chhattisgarh, covering 0.98 hectares. The facility will produce 35,000 bulletproof vests and 35,000 ballistic helmets annually. As of June 2025, the project has received establishment consent from the state pollution control authorities.