New & Upcoming Projects in Chemicals Projects in Gujarat – Page 2

1,696 upcoming and ongoing chemicals projects in Gujarat worth ?6.76 lakh crore, with investment, location, project stage and latest status. Last updated 16 Oct 2026.

Projects tracked
1,696
Total investment
₹6.76 lakh crore
Projects above ₹100 Cr
278
Added in the last 30 days
21

Latest chemicals projects in Gujarat

Showing 6–10 of 1,696
  1. Pre Project Stage Pharmaceuticals Updated

    Synthetic Organic Chemicals Manufacturing Unit in Ahmedabad, Gujarat

    Gujarat Less than 100 Million

    A new Active Pharmaceutical Ingredient (API) and intermediates manufacturing facility is proposed at Dhanvada village in Bavla taluka, Ahmedabad district, Gujarat. The unit will have a total production capacity of about 60.1 MT per month across APIs, intermediates and R&D products. The proposal has been granted Standard ToR by the Ministry of Environment, Forest and Climate Change and is currently at the pre-construction stage.

    View project
  2. Under Implementation Synthetic Organic Chemicals Updated

    Rs.4380 Million New Synthetic Organic Chemicals Mfg. Unit in Bharuch, Gujarat

    Gujarat From 1000 Million to 4999 Million

    A new plasticizers manufacturing facility is proposed on a 6.674 hectare plot at Saykha Industrial Estate, Vagra taluka, Bharuch district, Gujarat, involving a total investment of Rs. 4380 Million. The proposal, filed as a fresh Terms of Reference application, is currently under examination by the Ministry of Environment, Forest and Climate Change, with construction yet to commence. Once operational, the unit is expected to generate around 100 permanent jobs.

    View project
  3. Pre Project Stage Petrochemicals Updated

    Rs.14821 Million Carbon Black Manufacturing Plant Expansion Project in Mundra, Gujarat

    Gujarat From 5000 Million to 49999 Million

    Expanding its existing carbon black manufacturing facility at Mundra, Kachchh district, Gujarat, from 20,100 MT/month to 20,485 MT/month capacity, alongside its associated 40 MW waste gas-based co-generation power plant. The proposal, filed as a Fresh ToR application, is currently under examination by the Ministry of Environment, Forest and Climate Change.

    View project
  4. Pre Project Stage Synthetic Organic Chemicals Updated

    Dyes Manufacturing Project in Bharuch, Gujarat

    Gujarat Less than 100 Million

    A new dyes and dye-intermediates manufacturing facility is proposed at Saykha Industrial Estate in Bharuch district, Gujarat, with a production capacity of about 6000 TPA (500 MT/month) covering Acid Black and Acid Brown dye variants. The proposal is currently under examination at the Terms of Reference stage with the Ministry of Environment, Forest and Climate Change, with no construction yet commenced.

    View project
  5. Pre Project Stage Tyres and Rubber Updated

    Rs.194000 Million Carbon Black Manufacturing Expansion Project in Kachchh, Gujarat

    Gujarat More than 49999 Million

    A major industrial complex in Kachchh, Gujarat is being expanded to raise carbon black capacity from 6.6 to 8.0 LTPA and captive power from 160 to 240 MW, alongside new off-road and on-road tyre lines, a mould/drum plant, dip roll fabric unit, wheel rim facility, tyre recycling unit, township and a speciality hospital. The proposal, covering a total post-expansion area of 301.161 ha, is currently under examination with the Ministry of Environment, Forest and Climate Change after a public hearing conducted in December 2023. Construction timelines are yet to be finalized pending further regulatory clearance.

    View project