Projects in Andhra Pradesh – Page 10

2,144 upcoming and ongoing projects in Andhra Pradesh worth ₹4,086,096 Cr, with investment, location, project stage and latest status. Last updated 09 Oct 2026.

Projects tracked
2,144
Total investment
₹4,086,096 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
38

Latest projects in Andhra Pradesh

Showing 46–50 of 2,144
  1. Pre Project Stage Electric Vehicles & Battery Manufacturing Updated

    Rs.13660 Million lithium-ion battery recycling and black mass processing facility planned at Andhra Pradesh.

    Andhra Pradesh From 5000 Million to 49999 Million

    A new end-to-end lithium-ion battery recycling and hydrometallurgical processing facility is proposed inside a notified SEZ in Andhra Pradesh, designed to handle up to 40,000 tonnes per annum of spent Li-ion batteries. The project will recover critical minerals such as lithium, cobalt and nickel via black mass and metal salt processing lines. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change, with land already acquired but construction yet to commence.

    View project
  2. Environment Clearance Stage Packaging / Plastics Updated

    Rs.200 Million New Self-Adhesive, Terminal Block and Polycarbonate Labels Mfg. Project in Tirupati, Andhra Pradesh

    Andhra Pradesh From 100 Million to 999 Million

    A new manufacturing unit is being set up to produce self-adhesive labels, terminal blocks and polycarbonate (PC) labels at Sricity IDA in Tirupati District. The unit will be spread over 2.16 acres and involves an investment of about ₹20 crore. The State Pollution Control Board has granted Consent to Establish for the facility, which is currently at the environmental clearance stage.

    View project
  3. Pre Project Stage Ferro Alloys Updated

    Rs.1400 Million Greenfield Submerged Electric Arc Furnace & Ferro Alloys Plant in Andhra Pradesh

    Andhra Pradesh From 1000 Million to 4999 Million

    A new greenfield facility with submerged electric arc furnaces (2 x 7.5 MVA & 1 x 12 MVA) is proposed to produce ferro silicon, ferro manganese, silico manganese and ferro chrome, along with a briquetting plant and manganese ore sinter plant. The project is sited on 2.78 Ha of non-forest land at Tatiguda village, Garividi, Vizianagaram district.

    View project
  4. Announcement Stage Renewable Power Projects Updated

    New 400 MW Solar Power Project in Kurnool district, Andhra Pradesh.

    Andhra Pradesh NA

    A 400 MW solar power project is planned at Nandipadu village, Kurnool district, in partnership with Lumara. The developer will handle complete EPC works along with an associated 400 kV Pooling Substation and transmission line to the Kurnool III CTUIL Substation for grid evacuation. The project is targeted for commissioning in 2027.

    View project
  5. Pre Project Stage Hotels / Hospitality Updated

    Rs.1000 Million Ongole Hotel Project in Andhra Pradesh

    Andhra Pradesh From 1000 Million to 4999 Million

    A 5-star hotel with 151 luxury rooms is coming up in Chadalawada village near Ongole, set to be the region's first 5-star property. The development will include a multi-cuisine restaurant, premium bar and lounge, an international-standard swimming pool, luxury spa, and modern fitness center. The foundation for the project has been laid, with the property being built to international hospitality standards.

    View project